Part 3 ROADS SUBJECT TO 50MPH SPEED LIMIT
| (1) Location | (2) Description |
|---|---|
| A5/A449 link road | Shown coloured yellow between points marked B and B1 as shown on the speed limits plans (Document 2.12A) |
| A5 | Shown coloured yellow between points marked H and I as shown on the speed limits plans (Document 2.12A) |