| (1) Location | (2) Description |
|---|
| A5/A449 link road | Shown coloured green between points marked A and A1 as shown on the speed limits plans (Document 2.12A) |
| A449 | Shown coloured green between points marked J and K as shown on the speed limits plans (Document 2.12A and 2.12C) |
| Crateford Lane | Shown coloured green between points marked L and L1 as shown on the speed limits plans (Document 2.12A) |
| Vicarage Road | Shown coloured purple between points F and F1 as shown on the speed limits plans (Document 2.12B) |
| Vicarage Road | Shown coloured purple between points G and G1 as shown on the speed limits plans (Document 2.12B) |