Part 4 LIMITED WAITING
| (1) Location | (2) Length | (3) Event |
|---|---|---|
| A449 Laybys | Between points V and W and X and Y as shown with a purple line on the traffic regulation plans (Document 2.11A). | Opening of the northbound A449 laybys as shown on the highway general arrangement plans (Document 2.9E). |