Schedule 1
The works referred to in this Order and shown on the deposited plan are–
| Work No. 1 | An intake structure located at National Grid Reference NR 94414972. |
| Work No. 2 | A raw water main from the intake on the Allt Easan Biorach to the new Treatment Works via the gauge at Work No. 3. |
| Work No. 3 | A gauge to measure and record the amount of water taken from the river and the rate at which the said amount was taken located at national Grid Reference NR 94264989. |
| Work No. 4 | A discharge pipe from the works located at National Grid Reference NR 94274992. |