OpenLegislation

Chapter 11 Assignment stage: pre-determined frequency assignments

United Kingdom

  1. 73Assignment of frequencies in respect of the 800 MHz coverage obligation lot
  2. 74Assignment of numbered 800 MHz paired frequency lots to winner of the 800 MHz coverage obligation lot
  3. 75Assignment of numbered 800 MHz paired frequency lots in the case where 800 MHz paired frequency lots were included in only one winning principal stage bid
  4. 76Assignment of numbered 800 MHz paired frequency lots in the case where 800 MHz paired frequency lots were included in two winning principal stage bids, one of which also included the 800 MHz coverage obligation lot
  5. 77Assignment of numbered 2.6 GHz paired frequency lots in the case where 2.6 GHz paired frequency lots were included in only one winning principal stage bid
  6. 78Assignment of 2.6 GHz concurrent low power 10 MHz lots in the case where 2.6 GHz paired frequency lots were included in only one winning principal stage bid
  7. 79Assignment of 2.6 GHz concurrent low power 20 MHz lots in the case where 2.6 GHz paired frequency lots were included in only one winning principal stage bid
  8. 80Assignment of numbered 2.6 GHz paired frequency lots and 2.6 GHz concurrent low power 10 MHz lots in the first special case
  9. 81Assignment of numbered 2.6 GHz paired frequency lots and 2.6 GHz concurrent low power 10 MHz lots in the second special case
  10. 82Assignment of 2.6 GHz paired frequency lots, 2.6 GHz concurrent low power 10 MHz lots and 2.6 GHz concurrent low power 20 MHz lots in the third special case
  11. 83Assignment of 2.6 GHz paired frequency lots, 2.6 GHz concurrent low power 10 MHz lots and 2.6 GHz concurrent low power 20 MHz lots in the fourth special case
  12. 84Assignment of 2.6 GHz concurrent low power 10 MHz lots in the case where 2.6 GHz paired frequency lots were included in more than one winning principal stage bid
  13. 85Assignment of 2.6 GHz concurrent low power 10 MHz lots and 2.6 GHz concurrent low power 20 MHz lots in the case where 2.6 GHz paired frequency lots were included in more than one winning principal stage bid
  14. 86Assignment of 2.6 GHz concurrent low power lots in the case where 2.6 GHz paired frequency lots were not included in any winning principal stage bid
  15. 87Assignment of 2.6 GHz individual frequency lots in the case where 2.6 GHz individual frequency lots were included in only one winning principal stage bid