The Wireless Telegraphy (Licence Award) Regulations 2020
S.I. 2020/1199 · Made 3 November 2020 · Extends to United Kingdom
Electronic Communications
Made 3rd November 2020
Coming into force 18th November 2020
The Office of Communications (“OFCOM”), in exercise of the powers conferred by section 14(1), (2), (3), (4), (6) and (7) and section 122(7) of the Wireless Telegraphy Act 2006 M1 (“the Act”), make the following Regulations.
Before making these Regulations OFCOM have given notice of their proposal to do so in accordance with section 122(4)(a) of the Act, published notice of their proposal in accordance with section 122(4)(b) of the Act and have considered the representations made to them before the time specified in that notice in accordance with section 122(4)(c) of the Act.
Annotations to the whole text
Marginal citations
- M1
Contents
- Part 1: Introductory
- 1Citation, commencement, and extent
- 2Interpretation
- Part 2: Application stage
- 3Applications for the grant of a licence
- 4Application
- 5Meaning of existing spectrum holdings
- Part 3: Qualification stage
- Chapter 1: Qualification
- 6Notification of names of applicants and associates
- 7Recording of applicant group members
- 8Subsequent changes to bidder groups
- 9Changes to existing spectrum holdings
- 10Fitness to hold a licence
- 11Qualification to participate in the award process
- 12Publication of names of qualified applicants
- 13Withdrawal of an application
- 14Determination of number of bidders
- Chapter 2: Additional deposit and eligibility limit for the first principal stage round
- 15Additional deposit before the first principal stage round
- 16Determination of a bidder's eligibility limit for the first principal stage round
- Chapter 3: Recording of existing spectrum holdings and overall bid constraints
- 17Recording of existing spectrum holdings
- 18Determination of overall bid constraints
- Part 4: Award process
- 19Principal stage, assignment stage and grant stage
- Part 5: The principal stage
- Chapter 1: Principal stage rounds
- 20Principal stage rounds
- 21Principal stage form
- 22Principal stage bids
- 23Number of principal stage rounds
- 24Round prices for the first principal stage round
- 25Determination of round prices for subsequent principal stage rounds
- 26Round price for 3.6 GHz lots
- 27Round price for 700 MHz individual frequency lots
- 28Round price for 700 MHz paired frequency lots
- Chapter 2: Assignment of standing high bid status
- 29Assignment of standing high bid status by OFCOM after the end of each principal stage round
- 30Process for assigning standing high bid status: ranking the bidders
- 31Process for assigning standing high bid status: ranking the bids
- 32Process for assigning standing high bid status: assigning standing high bid status to the bids
- Chapter 3: Winning principal stage bids and determination of base price
- 33Determination of the winning principal stage bids
- 34Determination of base price
- 35Determination of total base price
- Chapter 4: Constraints on principal stage bids
- 36Maximum and minimum number of principal stage bids for 3.6 GHz lots, 700 MHz individual frequency lots and 700 MHz paired frequency lots
- 37Overall bid constraint rule
- 38Number of principal stage bids following assignment of standing high bid status
- 39Request by a bidder to carry forward its eligibility limit
- 40Eligibility rule
- 41Determination of a bidder's eligibility limit
- 42Eligibility points used by a bidder
- 43Eligibility event
- 44Deposit constraint on bidding
- Chapter 5: Information released during and following the principal stage
- 45Notice to be given to bidders before each principal stage round
- 46Notification of information to bidders after the end of each principal stage round
- 47Publication of information at the end of each day during the principal stage
- 48Notification of results of the principal stage to bidders
- 49Publication of results of the principal stage
- Chapter 6: Procedure for principal stage
- 50Submission of principal stage form to OFCOM
- 51Alternative method for submission of principal stage form
- 52Incomplete or defective principal stage form
- 53Notification that principal stage form is not valid
- Chapter 7: Deposits during and following the principal stage
- 54Deposits during the principal stage
- 55Required final principal stage deposit
- Part 6: Assignment stage
- Chapter 1: Overview
- 56No assignment stage if there are no winning principal stage bidders
- 57Assignment stage process
- Chapter 2: Assignment of lots of a particular type without bidding
- 58Assignment of numbered 3.6 GHz lots without bidding
- 59Assignment of 700 MHz individual frequency lots without bidding.
- 60Assignment of 700 MHz paired frequency lots without bidding
- Chapter 3: Assignment of lots of a particular type by means of a bidding process (and negotiation period, if any)
- 61Assignment of 3.6 GHz lots by bidding
- 62Assignment of numbered 700 MHz individual frequency lots by bidding
- 63Assignment of numbered 700 MHz paired frequency lots by bidding
- 64Assignment stage round
- Chapter 4: Assignment stage form
- 65Assignment stage form
- 66Valid assignment stage form
- 67Notification that an assignment stage form is not valid
- Chapter 5: 3.6 GHz lot assignment stage bidding
- 68Bidding for numbered 3.6 GHz lots in the assignment stage
- 69Preparing a 3.6 GHz assignment stage option list for each bidder
- 703.6 GHz assignment stage bids
- Chapter 6: 700 MHz individual frequency lot assignment stage bidding
- 71Bidding for numbered 700 MHz individual frequency lots in the assignment stage
- 72Preparing a 700 MHz individual frequency lot assignment stage option list for each bidder
- 73700 MHz individual frequency lot assignment stage bids
- Chapter 7: 700 MHz paired frequency lot assignment stage bidding
- 74Bidding for numbered 700 MHz paired frequency lots in the assignment stage
- 75Preparing a 700 MHz paired frequency lot assignment stage option list for each bidder
- 76700 MHz paired frequency lot assignment stage bids
- Chapter 8: Procedure for bidding in the assignment stage
- 77Notice to bidders before the assignment stage round
- 78Submission of assignment stage form to OFCOM
- 79Alternative method for submission of assignment stage form
- 80Incomplete or defective assignment stage form
- 81Required assignment stage deposit
- Part 7: Negotiation period for the assignment of 3.6 GHz lots
- Chapter 1: Adjacency agreements
- 82Full adjacency agreement
- 83Partial adjacency agreement
- Chapter 2: Procedure for the negotiation period
- 84Notice to bidders before the negotiation period
- 85Notice to OFCOM of bidders' desire to participate in the negotiation period
- Chapter 3: Valid full adjacency agreement and valid partial adjacency agreement
- 86Valid full adjacency agreement
- 87Valid partial adjacency agreement
- 88Additional required bids in the case of a partial adjacency agreement
- 89Consequence of additional required bids
- 90Rejection of full adjacency agreement forms submitted to OFCOM at a time outside the first phase and second phase of the negotiation period
- 91Rejection of partial adjacency agreement forms submitted to OFCOM at a time outside the second phase of the negotiation period
- 92Only one valid adjacency agreement
- 93First form delivered within a negotiation phase by a winning bidder for 3.6 GHz lots to be used by OFCOM
- 94Incomplete or defective adjacency agreement forms
- 95The end of the first phase of the negotiation period
- Part 8: Ofcom's determination of the assignment of numbered lots and the additional prices
- Chapter 1: Assignment of numbered 3.6 GHz lots where there is either a valid full adjacency agreement or one or more valid partial adjacency agreements
- 96Determination of assignment of 3.6 GHz lots where there is a valid full adjacency agreement
- 97Determination of the winning 3.6 GHz assignment stage bids where there are one or more valid partial adjacency agreements
- Chapter 2: Ofcom's determination of assignment of numbered 3.6 GHz lots and additional prices where there is no valid full adjacency agreement and no valid partial adjacency agreement
- 98Determination of the winning 3.6 GHz assignment stage bids where there is no valid full adjacency agreement and no valid partial adjacency agreement
- Chapter 3: Determination of 3.6 GHz lot additional prices
- 99Determination of 3.6 GHz lot additional prices where there is a valid full adjacency agreement
- 100Determination of 3.6 GHz lot additional prices where there is one or more valid partial adjacency agreements
- 101Determination of 3.6 GHz lot additional prices where there is no adjacency agreement
- Chapter 4: Determination of assignment of numbered 700 MHz individual frequency lots and 700 MHz individual frequency lot additional prices
- 102Determination of the winning 700 MHz individual frequency lot assignment stage bids
- 103Determination of 700 MHz individual frequency lot additional prices
- Chapter 5: Determination of assignment of numbered 700 MHz paired frequency lots and 700 MHz paired frequency lot additional prices
- 104Determination of the winning 700 MHz paired frequency lot assignment stage bids
- 105Determination of 700 MHz paired frequency lot additional prices
- Chapter 6: Notification of results of the assignment stage
- 106Notification of results of the assignment stage
- Part 9: Grant Stage
- Chapter 1: Licences available, the determination of licence fees and the particular frequencies
- 107Interpretation
- 108Determination of licences, licence fees and frequencies associated with particular licences
- 109Licences which may be granted under this award process
- 110Licence fee payable by a winning bidder for a 3.6 GHz licence
- 111Licence fee payable by a winning bidder for a 700 MHz licence
- 112Particular frequencies to be included in 3.6 GHz licence granted to a winning bidder
- 113Particular frequencies to be included in 700 MHz lot licence granted to a winning bidder
- Chapter 2: Total auction sum
- 114Determination of the total auction sum payable by winning bidders to OFCOM
- 115Notification of the total auction sum payable by winning bidders to OFCOM
- 116Further payment where the amount of a winning bidder's deposit is less than its total auction sum
- Chapter 3: Grant of licences
- 117Entitlement to the grant of licences
- 118Grant of licences
- Chapter 4: Completion of the award process
- 119Refunds
- 120Notification to bidders following the grant of licences
- 121Completion of the award process
- Part 10: Forfeit of deposit and exclusion
- 122Forfeit of deposit and exclusion from award process
- 123Bids made by an excluded bidder
- 124Events
- Part 11: Miscellaneous
- 125General power of exclusion
- 126Notification to OFCOM
- 127Changes to timing or location
- 128Changes to round times and use of electronic auction system
- 129Rerunning rounds
- 130Refunds
- 131Deposits
- Signature
- Schedule 1: Lots
- Paragraph
- Schedule 2: Application form and warranty
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Schedule 3: Document for member of applicant's applicant group or bidder group who is not an associate
- Paragraph
- Paragraph
- Applicant/bidder
- Paragraph
- [Insert name of person to be included in applicant or bidder group who is not an associate]
- Paragraph
- Schedule 4: Determination of 3.6 GHz lot additional prices
- 1Additional price
- 2First requirement
- 3Second requirement
- 4Third requirement
- 5Fourth requirement
- 6Interpretation
- Schedule 5: Determination of 700 MHz individual frequency lot additional prices
- 1Additional price
- 2First requirement
- 3Second requirement
- 4Third requirement
- 5Fourth requirement
- 6Interpretation
- Schedule 6: Determination of 700 MHz paired frequency lot additional prices
- 1Additional price
- 2First requirement
- 3Second requirement
- 4Third requirement
- 5Fourth requirement
- 6Interpretation
- Schedule 7Frequency bands for existing spectrum holdings
- Schedule 8: Partial adjacency agreement form
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Schedule 9: Full adjacency agreement form
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Explanatory note