OpenLegislation

Schedule 1 SCHEDULED WORKS

Original text. Later amendments are not shown.

In the Metropolitan Borough of Wirral–

  • Work No. 1—A combined street tramway and tramroad forming a single line of rails 196 metres in length commencing by a junction with the western terminus of the Wirral Tramway in Shore Road, authorised by the Wirral Tramway Light Railway Order 1994f1, at a point 87 metres north-east of the junction of Shore Road with Canning Street, passing across Canning Street in a south-westerly direction and terminating at a point 96 metres south-south-west of the south-western kerbline of Canning Street.

  • Work No. 1A—A combined street tramway and tramroad forming a single line of rails 75 metres in length commencing by a junction with Work No. 1 at a point 64 metres south-west of the south-western kerbline of Canning Street passing in a south-easterly direction towards, and passing across, Taylor Street and terminating at a point on the east side of Taylor Street 36 metres south-west of the junction of Taylor Street with Bridge Street.

Annotations

Footnotes

f1

S.I. 1994/1761.