OpenLegislation

Paragraph 2 Detailed design approvalI1

England, Wales and Scotland

(1)

The authorised development must be carried out in accordance with the approved plans, inclusive of any limits of deviation, bearing the references listed below and any other plans, drawings, documents, details, schemes, statements or strategies which are approved by the relevant planning authority pursuant to any requirement (as the same may be amended by approval of the relevant planning authority pursuant to requirement 15(1))—

Table 2

works planSubmission document reference number 2.3
access rights of way planSubmission document reference number 2.4
(2)

The authorised development must not exceed the maximum parameters specified in Table 3 below (as the same may be amended by approval of the relevant planning authority under requirement 15(1))—

Table 3

(1)

Element of authorised development

(2)

Maximum height

(metres) above a site level of 30 metres AOD

(3)

Maximum width

(metres)

(4)

Maximum length

(metres)

(5)

Other parameters

Gas turbine building (part of numbered work 1A)25 metres45 metres60 metres-
Each Heat Recovery Steam Generator Building (part of numbered work 1A)35 metres13 metres25 metres-
Each exhaust gas emission flue stack (part of numbered work 1A)50 metres--Maximum diameter 6.5 metres
Steam turbine building (part of numbered work 1A)21 metres26 metres45 metres-
Air cooled condenser (part of numbered work 1A)26 metres48 metres48 metres-
Switchgear room (part of numbered work 1D)5 metres10 metres15 metres-
Raw/fire water storage tank (part of numbered work 1C)20 metres--Maximum diameter 15 metres
Each water storage tank (part of numbered work 1C)20 metres--Maximum diameter 5 metres
Water treatment system (part of numbered work 1C)10 metres25 metres20 metres-
Workshop (part of numbered work 1B)10 metres20 metres30 metres-
Natural gas pressure regulating installation (PRI) (part of numbered work 1B)5 metres25 metres35 metres-
Administration/ control building (numbered work 1E)10 metres10 metres20 metres-
Heat network interface building (numbered work 1F)15 metres25 metres45 metres-
The first transformer compound (part of numbered work 1D)6 metres15 metres15 metres-
The second and third transformer compounds (part of numbered work 1D)6 metres10 metres15 metres-
132kV switchyard (part of work numbered 1D)10 metres42 metres73 metres-
Perimeter fencing (part of numbered work 1G)2.5 metres---
(3)

To the extent that design objectives relating to any numbered work are set out in the design objectives statement, that numbered work must be designed substantially in accordance with the relevant design objective set out therein.

(4)

Numbered work 1 and, in respect of the security kiosk and weighbridge only, numbered work 2B may not commence until written details of the following have been submitted to and approved by the relevant planning authority—

(a)

the siting, design, external appearance, dimensions and floor levels of all permanent buildings and structures; and

(b)

the colour, materials and surface finishes of all permanent buildings and structures.

(5)

The details to be submitted for approval under sub-paragraph (4) must include appropriately scaled plans and sectional drawings.

Annotations

Commencement

I1

Sch. 3 para. 2 in force at 8.8.2017, see art. 1