Paragraph 2 Detailed design approvalI1
England, Wales and Scotland
The authorised development must be carried out in accordance with the approved plans, inclusive of any limits of deviation, bearing the references listed below and any other plans, drawings, documents, details, schemes, statements or strategies which are approved by the relevant planning authority pursuant to any requirement (as the same may be amended by approval of the relevant planning authority pursuant to requirement 15(1))—
Table 2
| works plan | Submission document reference number 2.3 |
| access rights of way plan | Submission document reference number 2.4 |
The authorised development must not exceed the maximum parameters specified in Table 3 below (as the same may be amended by approval of the relevant planning authority under requirement 15(1))—
Table 3
(1) Element of authorised development | (2) Maximum height (metres) above a site level of 30 metres AOD | (3) Maximum width (metres) | (4) Maximum length (metres) | (5) Other parameters |
|---|---|---|---|---|
| Gas turbine building (part of numbered work 1A) | 25 metres | 45 metres | 60 metres | - |
| Each Heat Recovery Steam Generator Building (part of numbered work 1A) | 35 metres | 13 metres | 25 metres | - |
| Each exhaust gas emission flue stack (part of numbered work 1A) | 50 metres | - | - | Maximum diameter 6.5 metres |
| Steam turbine building (part of numbered work 1A) | 21 metres | 26 metres | 45 metres | - |
| Air cooled condenser (part of numbered work 1A) | 26 metres | 48 metres | 48 metres | - |
| Switchgear room (part of numbered work 1D) | 5 metres | 10 metres | 15 metres | - |
| Raw/fire water storage tank (part of numbered work 1C) | 20 metres | - | - | Maximum diameter 15 metres |
| Each water storage tank (part of numbered work 1C) | 20 metres | - | - | Maximum diameter 5 metres |
| Water treatment system (part of numbered work 1C) | 10 metres | 25 metres | 20 metres | - |
| Workshop (part of numbered work 1B) | 10 metres | 20 metres | 30 metres | - |
| Natural gas pressure regulating installation (PRI) (part of numbered work 1B) | 5 metres | 25 metres | 35 metres | - |
| Administration/ control building (numbered work 1E) | 10 metres | 10 metres | 20 metres | - |
| Heat network interface building (numbered work 1F) | 15 metres | 25 metres | 45 metres | - |
| The first transformer compound (part of numbered work 1D) | 6 metres | 15 metres | 15 metres | - |
| The second and third transformer compounds (part of numbered work 1D) | 6 metres | 10 metres | 15 metres | - |
| 132kV switchyard (part of work numbered 1D) | 10 metres | 42 metres | 73 metres | - |
| Perimeter fencing (part of numbered work 1G) | 2.5 metres | - | - | - |
To the extent that design objectives relating to any numbered work are set out in the design objectives statement, that numbered work must be designed substantially in accordance with the relevant design objective set out therein.
Numbered work 1 and, in respect of the security kiosk and weighbridge only, numbered work 2B may not commence until written details of the following have been submitted to and approved by the relevant planning authority—
the siting, design, external appearance, dimensions and floor levels of all permanent buildings and structures; and
the colour, materials and surface finishes of all permanent buildings and structures.
The details to be submitted for approval under sub-paragraph (4) must include appropriately scaled plans and sectional drawings.