Part 2 RIGHTS AND RESTRICTIONS REQUIRED FOR THE CONVEYOR ROUTE – CROWN LAND (NORTHERN)I1
England and Wales
(1) Number of land shown on land plans | (2) Class or classes of rights sought as described in the book of reference | (3) Purpose for which rights may be acquired or restrictions imposed |
|---|---|---|
| 1 | 1, 2, 4 and 9 | (a) Dredging; (b) demolition of the existing jetty; (c) construction, operation, use and maintenance of the quay; (d) installation, maintenance and use of ship loaders; and (e) construction, operation, use and maintenance of the conveyor system, and to obtain access for such purposes. |
| 2, 3 | 1 and 9 | (a) Dredging; and (b) demolition of the existing jetty, and to obtain access for such purposes. |
| 6 | 1 and 9 | Dredging and to obtain access for such purposes. |
| 10 | 4, 5, 9 and 10 | (a) Construction, operation, use and maintenance of the conveyor system along the conveyor route (northern); (b) installation and maintenance of support foundations for the conveyor and a transfer tower along the conveyor route (northern); and (c) installation, use and maintenance of services, signage, lighting, CCTV, and to obtain access for such purposes and to impose restrictions for the protection of the conveyor structure and footings. |
Annotations
Commencement
- I1
Sch. 3 Pt. 2 in force at 10.8.2016, see art. 1