Paragraph I1
England, Wales and Scotland
With Work Nos. 4a and 4b including—
construction of new highway with associated embankments, ground improvements, drainage facilities and roadside furniture;
the provision of a hardened central reserve with a rigid concrete barrier or steel step barrier dividing the southbound and northbound carriageways;
installation of lighting columns in the verge;
the construction of advanced directional gantry signs, including sign foundations and sign structures;
demolition of existing verge mounted road signs and installation of replacement new road signs including sign foundations, sign structure, signs, signals, sign illumination, control cabinets, power and communication cable connections;
treatment of underground historical mine workings to reduce the risk of ground instability to include drilling and grouting and/or installation of other protection measures;
landscaping;
relocation of existing internally illuminated tactical variable message sign within verge with associated ducting and reinstallation of existing CCTV in its current position; and
associated utility works and diversions within the highway verge of each carriageway;
Annotations
Commencement
- I1
Sch. 1 in force at 9.2.2021, see art. 1
Notes on the whole SI
Textual amendments
- F1
Words in Preamble inserted (1.5.2021) by The A1 Birtley to Coal House Development Consent (Correction) Order 2021 (S.I. 2021/551), art. 1, Sch.
- F2
Words in Preamble omitted (1.5.2021) by virtue of The A1 Birtley to Coal House Development Consent (Correction) Order 2021 (S.I. 2021/551), art. 1, Sch.