Part 8 FOR THE PROTECTION OF THE PORT OF LONDON AUTHORITY
England and Wales
- 96Application
- 97Interpretation
- 98Approval of detailed design (excluding the tunnelling works)
- 99Design of, and coordination of, tunnelling works to ensure existing and future use of river Thames
- 100Construction of tunnelling works
- 101As built drawings
- 102Discharges etc.
- 103Removal of temporary works
- 104Protective action
- 105Facilities for navigation
- 106Use of land above the riverbed of the river Thames
- 107Survey of the river Thames riverbed
- 108Statutory functions
- 109Indemnity
- 110Disposals, etc.
- 111Navigational lights, buoys, etc.
- 112Directions as to lights
- 113Removal, etc. of the PLA’s moorings and buoys
- 114Abandoned or decayed works
- 115Apparatus in the tunnel area
- 116Disputes