The A122 (Lower Thames Crossing) Development Consent Order 2025
S.I. 2025/462 · Made 25 March 2025 · Extends to England and Wales
Infrastructure Planning
Made 25th March 2025
Coming into force 15th April 2025
The application was examined by a Panel of five members (“the Panel”) in accordance with Chapter 4 of Part 6 of the 2008 Act, and the Infrastructure Planning (Examination Procedure) Rules 2010f3.
The Panel, having examined the application with the documents that accompanies the application, and considered the representations made and not withdrawn, in accordance with section 74(2) of the 2008 Act, has submitted a report and recommendation to the Secretary of State.
The Secretary of State, having considered the representations made and not withdrawn, and the report of the Panel, has decided to make an Order granting development consent for the development described in the application with modifications which in the opinion of the Secretary of State do not make any substantial changes to the proposals comprised in the application.
The Secretary of State is satisfied that replacement land (as defined in article 40(8) (special category land) of this Order) has been or will be given in exchange for parcels of common land and open space (both terms as defined in section 19(4) of the Acquisition of Land Act 1981f4) comprised within the Order land, and the replacement land has been or will be vested in the prospective seller and subject to the same rights, trusts and incidents as attach to that common land and open space, and that, accordingly, sections 131(4) and 132(4) of the 2008 Act apply.
The Secretary of State is satisfied that parcels of open space comprised within the Order land are required for the drainage of an existing highway and that the giving in exchange of other land is unnecessary, whether in the interests of the persons, if any, entitled to rights of common or other rights or in the interests of the public, and accordingly, section 131(5) of the 2008 Act applies.
In accordance with section 132(3) of the 2008 Act, the Secretary of State is satisfied, having considered the report and recommendation of the Panel, that the parcels of open space and common land comprised within the Order land, when burdened with a new right created under this Order, will be no less advantageous than they were before the making of this Order to the following persons: (a) the persons in whom they are vested; (b) other persons, if any, entitled to rights of common or other rights; and (c) the public.
The Secretary of State, in exercise of the powers conferred by sections 114f5, 115f6, 117f7, 120f8, 122f9, 123f10, 127f11, 131f12, 135, 138f13, 143, 147f14 and 150 of, and paragraphs 1 to 4, 10 to 23, 26, 30Af15, 30Bf16, 32Af17 to 33, 36 and 37 of Part 1 of Schedule 5 to, the 2008 Act, makes the following Order—
Annotations to the whole text
Footnotes
- f1
-
2008 c. 29. Parts 1 to 7 were amended by Chapter 6 of Part 6 of the Localism Act 2011 (c. 20).
- f2
-
S.I. 2009/2264, amended by S.I. 2010/439, S.I. 2010/602, S.I. 2012/635, S.I. 2012/2654, S.I. 2012/2732, S.I. 2013/522, S.I. 2013/755, S.I. 2014/469, S.I. 2014/2381, S.I. 2015/377, S.I. 2015/1682, S.I. 2017/524, S.I. 2017/572, S.I. 2018/378, S.I. 2019/734, S.I. 2020/764, S.I. 20201534, S.I. 2021/978, S.I. 2022/634, S.I. 2023/1071 and S.I. 2024/332.
- f3
-
S.I. 2010/103, amended by S.I. 2012/635 and S.I. 2024/317.
- f4
- f5
-
Section 114 was amended by paragraph 55 of Part 1 of Schedule 11 to the Localism Act 2011.
- f6
-
Section 115 was amended by paragraph 56 of Part 1 of Schedule 13 and Part 20 of Schedule 25 to the Localism Act 2011, section 160 of the Housing and Planning Act 2016 (c. 22) and section 43 of the Wales Act 2017 (c. 4).
- f7
-
Section 117 was amended by paragraph 58 of Part 1 of Schedule 13 and Part 20 of Schedule 25 to the Localism Act 2011.
- f8
-
Section 120 was amended by section 140 of, and paragraph 60 of Part 1 of Schedule 13 to, the Localism Act 2011.
- f9
-
Section 122 was amended by paragraph 62 of Part 1 of Schedule 13 to the Localism Act 2011.
- f10
-
Section 123 was amended by paragraph 62 of Part 1 of Schedule 13 to the Localism Act 2011.
- f11
-
Section 127 was amended by paragraph 64 of Part 1 of Schedule 13 to the Localism Act 2011 and section 23(2) of the Growth and Infrastructure Act 2013 (c. 27).
- f12
-
Section 131 was amended by section 24(2) of the Growth and Infrastructure Act 2013.
- f13
-
Section 138 was amended by section 23(4) of the Growth and Infrastructure Act 2013 and S.I. 2017/1285.
- f14
-
Section 147 was amended by paragraph 68(2) of Schedule 13 and Part 20 of Schedule 25 to the Localism Act 2011.
- f15
-
Paragraphs 30A was inserted by paragraph 4(5) of Part 1 of Schedule 8 to the Marine and Coastal Access Act 2009 (c. 23) and amended by paragraph 76 of Part 3 of Schedule 6 to the Wales Act 2017.
- f16
-
Paragraph 30B was inserted by paragraph 4(5) of Part 1 of Schedule 8 to the Marine and Coastal Access Act 2009 (c. 23) and amended by paragraph 76 of Part 3 of Schedule 6 to the Wales Act 2017.
- f17
-
Paragraphs 32A and 32B were inserted by paragraph 71(3) of Part 1 of Schedule 13 to the Localism Act 2011.
Contents
- Part 1: PRELIMINARY
- 1Citation and commencement
- 2Interpretation
- Part 2: PRINCIPAL POWERS
- 3Development consent, etc. granted by the Order
- 4Maintenance of authorised development
- 5Maintenance of drainage works
- 6Limits of deviation
- 7Benefit of Order
- 8Consent to transfer benefit of Order
- Part 3: STREETS
- 9Application of the 1991 Act
- 10Construction and maintenance of new, altered or diverted streets and other structures
- 11Access to works
- 12Temporary closure, alteration, diversion and restriction of use of streets
- 13Use of private roads for construction
- 14Permanent stopping up of streets and private means of access
- 15Classification of roads, etc.
- 16Clearways, speed limits and prohibitions
- 17Traffic regulation – local roads
- Part 4: SUPPLEMENTAL POWERS
- 18Powers in relation to relevant navigations or watercourses
- 19Discharge of water
- 20Protective work to land and buildings
- 21Authority to survey and investigate the land
- 22Removal of human remains
- 23Felling or lopping of trees and removal of hedgerows
- 24Trees subject to tree preservation orders
- Part 5: POWERS OF ACQUISITION AND POSSESSION OF LAND
- 25Compulsory acquisition of land
- 26Compulsory acquisition of land – incorporation of the mineral code
- 27Time limit for exercise of authority to acquire land compulsorily
- 28Compulsory acquisition of rights and imposition of restrictive covenants
- 29Private rights over land
- 30Modification of Part 1 of the 1965 Act
- 31Application of the 1981 Act
- 32Modification of the 2017 Regulations
- 33Acquisition of subsoil or airspace only
- 34Rights under or over streets
- 35Temporary use of land for carrying out the authorised development
- 36Temporary use of land for maintaining the authorised development
- 37Statutory undertakers
- 38Apparatus and rights of statutory undertakers in stopped up streets
- 39Recovery of costs of new connections
- 40Special category land
- 41Disregard of certain improvements, etc.
- 42Set off for enhancement in value of retained land
- 43Crown rights
- Part 6: OPERATIONS
- 44Power to operate, use and close the tunnel area
- 45Road user charging
- 46Suspension of road user charging
- 47No apparatus in the tunnel area without consent
- 48Protection of the tunnel area, etc.
- 49Removal of vehicles
- 50Removal of obstructions
- 51Byelaws relating to the tunnel area
- 52Fixed penalty notices relating to byelaws
- Part 7: MISCELLANEOUS AND GENERAL
- 53Disapplication of legislative provisions, etc.
- 54Designation of fen land
- 55Application of local legislation, etc.
- 56Planning permission, etc.
- 57Application of landlord and tenant law
- 58Defence to proceedings in respect of statutory nuisance
- 59Protection of interests
- 60Deemed marine licence
- 61SACR
- 62Certification of documents, etc.
- 63Service of notices
- 64Arbitration
- 65Financial arrangements for the Kent Downs National Landscape
- 66Power to override easements and other rights
- 67No double recovery
- 68Interface with waste operation permits
- Signature
- Schedule 1: AUTHORISED DEVELOPMENT
- 1AUTHORISED WORKS
- 2WORKS TO SCHEDULED MONUMENTS
- Schedule 2: REQUIREMENTS
- Part 1: REQUIREMENTS
- 1Interpretation
- 2Time limits
- 3Detailed design
- 4Construction and handover environmental management plans
- 5Landscaping and ecology
- 6Contaminated land and groundwater
- 7Protected species
- 8Surface and foul water drainage
- 9Historic environment
- 10Traffic management
- 11Construction travel plans
- 12Fencing
- 13Travellers’ site in Thurrock
- 14Traffic monitoring
- 15Interaction with Thurrock Flexible Generation Plant
- 16Carbon and energy management plan
- 17Passive provision for Tilbury link road
- 18Operation of the Orsett Cock roundabout
- 19Amendments to approved details
- 20Amendments to the control documents
- Part 2: PROCEDURE FOR DISCHARGE OF REQUIREMENTS
- 21Applications made to the Secretary of State under Part 1
- 22Further information
- 23Details of consultation
- 24Register of requirements
- 25Anticipatory steps towards compliance with any requirement
- Part 3: AMENDMENTS TO BE MADE TO THE CONTROL DOCUMENTS
- 26Amendments to be made to the Code of Construction Practice and the REAC
- 27Amendments to be made to the Outline LEMP
- 28Amendments to be made to the Outline LEMP
- 29Amendments to be made to the Design Principles Document
- 30Amendments to be made to the Consents and Agreements Position Statement
- 31Amendments to be made to the SACR
- Schedule 3TEMPORARY CLOSURE, ALTERATION, DIVERSION AND RESTRICTION OF USE OF STREETS AND PRIVATE MEANS OF ACCESS
- Schedule 4: PERMANENT STOPPING UP OF STREETS AND PRIVATE MEANS OF ACCESS
- 1HIGHWAYS TO BE STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED
- 2HIGHWAYS TO BE STOPPED UP FOR WHICH A SUBSTITUTE IS NOT TO BE PROVIDED
- 3OTHER STREETS OR PRIVATE MEANS OF ACCESS TO BE STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED
- 4OTHER STREETS OR PRIVATE MEANS OF ACCESS TO BE STOPPED UP FOR WHICH A SUBSTITUTE IS NOT TO BE PROVIDED
- Schedule 5: CLASSIFICATION OF ROADS, ETC.
- 1SPECIAL ROADS
- 2TRUNK ROADS
- 3GLA ROADS
- 4CLASSIFIED ROADS
- 5UNCLASSIFIED ROADS
- 6OTHER PUBLIC RIGHTS OF WAY AND PERMISSIVE PATHS
- Schedule 6: TRAFFIC REGULATION MEASURES
- 1SPEED LIMITS
- 2CLEARWAYS AND OTHER RESTRICTIONS
- 3VARIATIONS OF EXISTING TRAFFIC REGULATION ORDERS
- Schedule 7TREES SUBJECT TO TREE PRESERVATION ORDERS
- Schedule 8LAND OF WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED
- Schedule 9: MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR CREATION OF NEW RIGHTS AND IMPOSITION OF RESTRICTIVE COVENANTS
- 1Compensation enactments
- 2Compensation enactments
- 3Compensation enactments
- 4Application of Part 1 of the 1965 Act
- 5Application of Part 1 of the 1965 Act
- 6Application of the 2017 Regulations
- Schedule 10LAND IN WHICH ONLY SUBSOIL OR NEW RIGHTS IN AND ABOVE SUBSOIL AND SURFACE MAY BE ACQUIRED
- Schedule 11LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN
- Schedule 12: ROAD USER CHARGING PROVISIONS FOR USE OF THE LOWER THAMES CROSSING
- 1Interpretation
- 2Application of the Enforcement Regulations
- 3Imposition of charges for the tunnel area
- 4Payment of charges
- 5Payments for local residents
- 6Other payments
- 7Penalty charge for non-payment of road user charge
- 8Exercise of powers
- 9Examination of motor vehicles
- 10Entering motor vehicles
- 11Seizure
- 12Immobilisation of motor vehicles
- 13Removal, storage and disposal of motor vehicles
- Schedule 13: LOWER THAMES CROSSING BYELAWS
- Part 1: PRELIMINARY
- 1Citation
- 2Interpretation
- Part 2: RESTRICTIONS IN THE TUNNEL AREA
- 3General safety
- 4Traffic regulation
- 5Breakdowns and falling loads
- 6Restrictions on conduct in the tunnel area
- Part 3: ENFORCEMENT
- 7Compliance with instructions, etc.
- 8Identification of authorised persons
- 9Breaches by authorised persons
- 10Attempted breach
- Schedule 14: PROTECTIVE PROVISIONS
- Part 1: FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE UNDERTAKERS
- 1Application
- 2Interpretation
- 3On street apparatus
- 4Apparatus in stopped up streets
- 5Protective works to buildings
- 6Acquisition of land
- 7Removal of apparatus
- 8Facilities and rights for alternative apparatus
- 9Retained apparatus
- 10Expenses and costs
- 11Expenses and costs
- 12Co-operation
- 13Co-operation
- Part 2: FOR THE PROTECTION OF OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS
- 14Application
- 15Interpretation
- 16Interpretation
- 17Interpretation
- Part 3: FOR THE PROTECTION OF DRAINAGE AUTHORITIES
- 18Application
- 19Interpretation
- 20Approval of plans
- 21Approval of plans
- 22Specified and protective works
- 23Maintenance of drainage works
- 24Expenses and indemnity
- 25Expenses and indemnity
- 26Expenses and indemnity
- 27Expenses and indemnity
- 28Disputes
- Part 4: FOR THE PROTECTION OF RAILWAY INTERESTS
- 29Application
- 30Interpretation
- 31Interpretation
- 32Interpretation
- 33Interpretation
- 34Interpretation
- 35Interpretation
- 36Interpretation
- 37Interpretation
- 38Interpretation
- 39Interpretation
- 40Interpretation
- 41Interpretation
- 42Interpretation
- 43Interpretation
- 44Interpretation
- 45Interpretation
- 46Interpretation
- 47Interpretation
- Part 5: FOR THE PROTECTION OF SPECIFIED GAS UNDERTAKERS
- 48Application
- 49Interpretation
- 50On Street apparatus
- 51Apparatus of the gas undertaker in stopped up streets
- 52Protective works to buildings
- 53Acquisition of land
- 54Removal of apparatus
- 55Facilities and rights for alternative apparatus
- 56Retained apparatus: protection of the gas undertaker
- 57Expenses
- 58Indemnity
- 59Enactments and agreements
- 60Co-operation
- 61Access
- 62Arbitration
- 63Notices
- Part 6: FOR THE PROTECTION OF NATIONAL GAS TRANSMISSION PLC AS GAS UNDERTAKER
- 64Application
- 65Interpretation
- 66Interpretation
- 67Apparatus of National Grid in stopped up streets
- 68Protective works to buildings
- 69Acquisition of land
- 70Removal of apparatus
- 71Facilities and rights for alternative apparatus
- 72Retained apparatus: protection of gas undertaker
- 73Expenses
- 74Indemnity
- 75Enactments and agreements
- 76Co-operation
- 77Access
- 78Arbitration
- 79Notices
- Part 7: FOR THE PROTECTION OF NATIONAL GRID ELECTRICITY TRANSMISSION PLC AS ELECTRICITY UNDERTAKER
- 80Application
- 81Interpretation
- 82Interpretation
- 83Apparatus of National Grid in stopped up streets
- 84Protective works to buildings
- 85Acquisition of land
- 86Removal of apparatus
- 87Facilities and rights for alternative apparatus
- 88Retained apparatus: protection of electricity undertaker
- 89Expenses
- 90Indemnity
- 91Enactments and agreements
- 92Co-operation
- 93Access
- 94Arbitration
- 95Notices
- Part 8: FOR THE PROTECTION OF THE PORT OF LONDON AUTHORITY
- 96Application
- 97Interpretation
- 98Approval of detailed design (excluding the tunnelling works)
- 99Design of, and coordination of, tunnelling works to ensure existing and future use of river Thames
- 100Construction of tunnelling works
- 101As built drawings
- 102Discharges etc.
- 103Removal of temporary works
- 104Protective action
- 105Facilities for navigation
- 106Use of land above the riverbed of the river Thames
- 107Survey of the river Thames riverbed
- 108Statutory functions
- 109Indemnity
- 110Disposals, etc.
- 111Navigational lights, buoys, etc.
- 112Directions as to lights
- 113Removal, etc. of the PLA’s moorings and buoys
- 114Abandoned or decayed works
- 115Apparatus in the tunnel area
- 116Disputes
- Part 9: FOR THE PROTECTION OF THE ENVIRONMENT AGENCY
- 117Application and Interpretation
- 118Submission and approval of plans
- 119Construction of protective works
- 120Timing of works and service of notices
- 121Works not in accordance with this Part
- 122Maintenance of works
- 123Remediating impaired drainage work
- 124Agency access
- 125Free passage of fish
- 126Indemnity
- 127Indemnity
- 128Disputes
- Part 10: FOR THE PROTECTION OF PORT OF TILBURY LONDON LIMITED
- 129Application
- 130Interpretation
- 131Approval of plans
- 132Approval of specified easements
- 133Restoration of Port land Repealed
- 134Consultation
- 135Notification of works to utilities and services affecting the Port
- 136Construction traffic management protocol within the Port Repealed
- 137Streets
- 138Minimising disruption to affected roads and streets within the Port
- 139Obstruction within the Port
- 140Land powers Repealed
- 141As-built plans
- 142Accumulation and erosion
- 143Permitting
- 144Port closure in emergency
- 145Interaction with the Tilbury2 Order Repealed
- 146Safeguarding of access to the Port by rail
- 147Disposals, etc.
- 148Costs
- 149Indemnity
- 150Disputes
- Part 11: FOR THE PROTECTION OF LOCAL HIGHWAY AUTHORITIES
- 151Application
- 152Definitions
- 153Design input and commencement
- 154Design input and commencement
- 155Survey reinstatement
- 156Inspections and testing of materials
- 157Road Safety Audits
- 158Defects in local highways constructed by the undertaker
- 159Provisional Certificate
- 160Maintenance
- 161Final Certificate
- 162Emergency Work
- 163Land interests
- 164Disputes
- Schedule 15: DEEMED MARINE LICENCE
- Part 1: INTRODUCTORY
- 1Interpretation
- 2Contact Details
- Part 2: LICENSABLE MARINE ACTIVITIES
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- Part 3: ENFORCEMENT
- 6Paragraph 6
- Part 4: CONDITIONS
- 7General conditions
- 8General conditions
- 9Distribution of copies
- 10Construction method statement
- 11Marine pollution contingency plan
- 12Concrete and cement
- 13Coatings and treatment
- 14Spills, etc.
- 15Piling techniques
- 16Noise registry
- 17Removal of temporary structures, etc.
- 18Notice of completion of licensable marine activity
- 19Licensable marine activity at Coalhouse Point
- Part 5: PROCEDURE FOR THE DISCHARGE OF CONDITIONS
- 20Meaning of “return”
- 21Further information regarding return
- 22Determination of return
- 23Notice of determination
- 24Arbitration
- Part 6: CHANGES TO THE DEEMED MARINE LICENCE
- 25Paragraph 25
- Schedule 16: DOCUMENTS TO BE CERTIFIED
- 1PLANS
- 2THE ENVIRONMENTAL STATEMENT AND RELATED DOCUMENTS
- 3OUTLINE MANAGEMENT PLANS AND RELATED CONTROL DOCUMENTS
- 4OTHER CERTIFIED DOCUMENTS
- Explanatory note