Schedule 5 LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIREDI1

England and Wales

(1)

Plot reference number shown on Land Plans

(2)

Purpose for which rights over land may be acquired

Land Plans – Sheet 1
1/1a, 1/1u, 1/1xTo construct, operate, access and maintain existing telecommunications mast.
1/1d, 1/1f, 1/1k, 1/1p, 1/1am, 1/3c, 1/3f, 1/4bTo construct, access and maintain boundary fencing.
1/1t, 1/1y, 1/1ah, 1/1akTo construct, operate, access and maintain the diverted electric cables.
1/1w

To construct, operate, access and maintain the diverted electric cables.

To construct, operate, access and maintain existing telecommunications mast.

To construct, access and maintain boundary fencing.

1/1af

To access and maintain the field ditch south and east of the A160.

To construct, access and maintain boundary fencing.

1/1ag

To construct, operate, access and maintain the diverted electric cables.

To construct, access and maintain boundary fencing.

Land Plans – Sheet 2
2/2b, 2/2f

To construct, operate, access and maintain the diverted water pipeline.

To construct, operate, access and maintain the diverted electric cable.

2/2c

To construct, operate, access and maintain the diverted water pipeline.

To construct, operate, access and maintain the diverted electric cable.

To construct, access and maintain boundary fencing.

2/2e

To construct, operate, access and maintain the diverted water pipeline.

To construct, operate, access and maintain the diverted electric cable.

To access and maintain the field ditch east of the A160.

To construct, access and maintain boundary fencing.

2/5a, 2/6aTo construct, operate, access and maintain the two diverted water pipelines.
2/5c

To construct, operate, access, maintain, use and protect the two diverted high and one intermediate pressure gas pipelines.

To construct, operate, access, maintain, use and protect the diverted high pressure gas pipeline.

To access and maintain the field ditch south of the A160.

To construct, access and maintain boundary fencing.

2/5d

To construct, operate, access, maintain, use and protect the two diverted high and one intermediate pressure gas pipelines.

To construct, operate, access, maintain, use and protect the diverted high pressure gas pipeline.

2/5i, 2/5m, 2/7bTo access and maintain the field ditch south of the A160.
2/6c

To construct, operate, access, maintain, use and protect the diverted high pressure gas pipeline.

To construct, operate, access, maintain, use and protect the two diverted high and one intermediate pressure gas pipelines.

2/7dTo construct, operate, access and maintain the diverted electric cable.
2/7f

To access and maintain the field ditch south of the A160.

To construct, access and maintain boundary fencing.

To construct, operate, access and maintain the diverted high pressure gas pipeline.

2/7gTo construct, operate, access and maintain the diverted high pressure gas pipeline.
2/7hTo construct, access and maintain boundary fencing.
2/8aTo construct, operate, access and maintain the diverted high pressure gas pipeline.
Land Plans – Sheet 3
3/5b, 3/5d

To construct, access and maintain the adjacent highway and drainage culvert.

To lay out new Public Right of Way diversion of the existing Footpath 91.

Land Plans – Sheet 4
4/1d

To construct, operate, access and maintain the diverted oxygen pipeline.

To access existing telecommunications mast.

4/1g, 4/1jTo construct, operate, access and maintain the diverted oxygen pipeline.
4/5bTo construct, operate, access and maintain the new section of road under the new rail bridge.

Annotations

Commencement

I1

Sch. 5 in force at 25.2.2015, see art. 1