Schedule 5 LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED
| (1)Plot Reference Number shown on Land Plans | (2)Purpose for which rights over land may be acquired |
|---|---|
| Land Plans – Sheet 1 | |
| 1/2c, 1/3b, 1/8 | To construct, operate, access and maintain an attenuation pond pipe outfall (Work No. 10). |
| 1/2d | To construct, operate, access and maintain a private means of access (Work No. 11). |
| 1/5b, 1/6b, 1/7b, 1/7f, 1/9d | To construct, operate, access and maintain electric cables, equipment and apparatus (Work No. 9). |
| Land Plans – Sheet 2 | |
| 2/1d, 2/2a, 2/2c, 2/2h, 2/2k, 2/4c | To construct, operate, access and maintain electric cables, equipment and apparatus (Work No. 9). |
| 2/4f, 2/4g, 2/5a, 2/5c | To construct, operate, access and maintain a private means of access (Work No. 11). |
| 2/6c | To construct, operate, access and maintain electric cables, equipment and apparatus (Work No. 9). To construct, operate, access and maintain a diverted water pipeline (Work No. 24). |
| 2/9c | To construct, operate, access and maintain an existing telecommunications cable (Work No. 25). To construct, operate, access and maintain an existing gas pipeline (Work No. 26). |