Schedule 5 LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIREDI1
England, Wales and Scotland
| (1) Plot Reference Number shown on Land Plans | (2) Purpose for which rights over land may be acquired | (3) Relevant part of the authorised development |
|---|---|---|
| Land Plans – Sheet 1 | ||
| 1/6c | Required for access to culvert for structural inspections and maintenance | Work No. 36 |
| 1/9a | Required for access to culvert for structural inspections and maintenance | Work No. 36 |
| 1/9b | Required for maintenance and access to existing water distribution main and to include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult | Work No. 60 |
| Land Plans – Sheet 2 | ||
| 2/1a | Required for maintenance and access to existing water distribution main and to include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult | Work No. 60 |
| 2/1g | Required to create access and egress points serving land situated south of Edge Lane, access to culvert for structural inspections and maintenance, and the establishment of environmental mitigation and enhancement | Work Nos. 9, 36, 49 |
| 2/1i | Required for access to culvert for structural inspections and maintenance, and the establishment of environmental mitigation and enhancement | Work Nos. 36, 50 |
| Land Plans – Sheet 3 | ||
| 3/3c | Required for the establishment of environmental mitigation and enhancement | Work No. 50 |
| Land Plans – Sheet 4 | ||
| 4/3b | Required for the establishment of environmental mitigation and enhancement | Work No. 50 |
| 4/4m | Required to allow access for maintenance of pond | Work No. 20 |
| 4/12a | Required for access to culvert for structural inspections and maintenance | Work No. 36 |
| 4/13b | Required for access to culvert for structural inspections and maintenance | Work No. 36 |
| 4/13g | Required for maintenance and access to utilities and to include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult | Work No. 59 |
| 4/13j | Required for the establishment of environmental mitigation and enhancement | Work No. 50 |
| 4/21 | Required to allow access for maintenance of pond | Work No. 20 |
| 4/22a | Required for maintenance and access to utilities equipment and to include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult | Work No. 59 |
| Land Plans – Sheet 5 | ||
| 5/1b | Required for maintenance and access to utilities and to include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult | Work No. 63 |
| 5/1f | Required for construction of realigned Carrhouse Lane and for maintenance and access to utilities and to include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult | Work Nos. 34, 63 |
| 5/1i | Required for maintenance and access to utilities and to include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult | Work No. 63 |
| 5/1j | Required for use of the realigned Carrhouse Lane | Work No. 23 |
| 5/4 | Required for maintenance and access to utilities and to include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult | Work No. 63 |
| 5/7d | Required for use of the realigned Carrhouse Lane | Work No. 23 |
| 5/7f | Required for the establishment of environmental mitigation and enhancement | Work No. 50 |
| 5/9d | Required for the establishment of environmental mitigation and enhancement and for maintenance and access to utilities equipment and to include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult | Work Nos. 50, 64 |
| Land Plans – Sheet 6 | ||
| 6/1b | Required for the establishment of environmental mitigation and enhancement and for maintenance and access to utilities equipment and to include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult | Work Nos. 50, 64 |
| 6/1d | Required for maintenance and access to utilities equipment and to include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult | Work No. 65 |
| 6/1f | Required for the establishment of environmental mitigation and enhancement including for flood storage | Work Nos. 50. 55 |
| 6/2a | Required for the establishment of environmental mitigation and enhancement including for flood storage, plus maintenance and access to utilities equipment and to include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult | Work Nos. 50, 55, 65 |
| 6/2d | Required to facilitate a new access to Tara Brook Farm | Work No. 25 |
| 6/2i | Required for the establishment of flood storage | Work No. 55 |
| 6/2j | Required for structures to facilitate the proposed River Etherow Bridge | Work Nos. 35, 50 |
| 6/2l | Required for the establishment of environmental mitigation and enhancement | Work No. 50 |
| 6/2n | Required for the establishment of flood storage | Work No. 55 |
| 6/3b | Required for maintenance and access to utilities equipment and to include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult | Work No. 65 |
| Land Plans – Sheet 7 | ||
| 7/1d | Required for the establishment of environmental mitigation and enhancement | Work No. 50 |
| Land Plans – Sheet 8 | ||
| 8/6 | Rights required to undertake and maintain works associated with the detrunking of the existing A57(T) between the M67 Junction 4 and Mottram Moor Junction including associated traffic calming measures and signage | Work No. 51 |
| 8/8c | Required for the establishment of environmental mitigation and enhancement and a new footpath between Mottram Moor Junction and existing LON 87/10 | Work Nos. 21, 49, 50 |
| Land Plans – Sheet 9 | ||
| 9/3 | Rights are required for Tameside MBC for maintenance and structural inspections of the underpass at Carrhouse Lane | Work No. 34 |
| 9/5 | Rights are required for Tameside MBC for maintenance and structural inspections of the underpass at Carrhouse Lane | Work No. 34 |
| 9/7c | Rights are required for Tameside MBC for maintenance and structural inspections of the underpass at Carrhouse Lane | Work No. 34 |
| 9/9c | Rights are required for Tameside MBC for maintenance and structural inspections of the underpass at Carrhouse Lane | Work No. 34 |
Annotations
Commencement
- I1
Sch. 5 in force at 7.12.2022, see art. 1