Article 11 Amendment to Schedule 2 (permanent stopping up of highways and private means of access and provision of new highways and private means of access)

Original text. Later amendments are not shown.

In the table in Part 3 of Schedule 2 that relates to Scheme 0405 (Temple Sowerby to Appleby) in the section headed Scheme 0405 – The rights of way and access plans – sheets 2 and 3—

(a)

in row 1—

(i)

in column (2), for the heading “Reference q; and Reference r”, omit “; and Reference r”;

(ii)

in column (4), for the entry headed “Reference 23” substitute—

“

(1)(2)(3)(4)

References 24 and 26

To be substituted by—

Reference 24: a new private means of access (including a right of vehicular access) providing access to the new footpath (Reference C); to land lying to the north of the new A66; and to maintenance strips on the north and south sides of the new A66; and crossing the new A66 (via a bridge) to connect the new private means of access (Reference 26) (as shown on sheet 2 and sheet 3 of the rights of way and access plans for scheme 0405); and

Reference 26: a new private means of access (including a right of vehicular access) from the edge of Ashton Lea field in a generally north-easterly direction for a distance of 93 metres and joining onto another new private means of access (Reference 24) at Point S and with a right of vehicular access over new footpath (Reference C) (as shown on sheet 2 of the rights of way and access plans for scheme 0405).

”

(b)

in row 2 in column (2), with the entry headed “Reference s”, for the entries in columns (3) and (4)” substitute—

“

(1)(2)(3)(4)
A length of Green Lane Track from a point 215 metres to the north of the junction of Green Lane Track with Footpath 336/011 in a north-easterly direction for a distance of 401 metres.

To be substituted by—

A new private means of access (Reference 24) from the edge of Ashton Lea field in a generally north-easterly direction for a distance of 494 metres and joining onto another new private means of access (Reference 26) at Point S, and with a right of vehicular access over new footpath (Reference C) from a point 162 metres to the west of Point U, continuing in a generally easterly direction to Point T and continuing from Point T to the junction of the new footpath with the existing Footpath 336/013 a total distance of 494 metres (as shown on sheets 2 and 3 of the rights of way and access plans for scheme 0405).

”