OpenLegislation

Article 55B Certification of additional plans etc.F1

(1)

The undertaker must, as soon as practicable after the making of the Able Marine Energy Park Development Consent (Amendment) Order 2022, submit for certification copies of—

(a)

the substitute design drawings, being those drawings with reference TR030006/APP/17;

(b)

the updated ecology plans, being those plans with reference TR030006/APP/14;

(c)

the updated rights of way plans, being those plans with reference TR030006/APP/15;

(d)

the updated environmental statement, being those documents with reference TR030006/APP/6 and TR030006/APP/6A;

(e)

the updated habitats regulations assessment, being those documents with reference TR030006/APP/7A, TR030006/APP/7B and TR030006/APP/7C; and

(f)

the updated works plans, being those plans with reference TR030006/APP/13.

(2)

A plan or document so certified by the Secretary of State is admissible in any proceedings as evidence of the contents of the document of which it is a copy.

Annotations

Textual amendments

F1

Art. 55B inserted (6.8.2022) by The Able Marine Energy Park Development Consent (Amendment) Order 2022 (S.I. 2022/881), arts. 1, 2(6)