Paragraph 5 Work No. 5I1
England, Wales and Scotland
Within the area shown on sheets 3, 4 and 5 of the works plans as Work No. 5, a hydrogen production facility and associated buildings, plant and infrastructure including—
Work No. 5a, within the area of land shown as such, being up to three hydrogen production units each including fired heater, fired heater flue gas stack, flare stack, heat exchangers, compressor buildings, associated structures, process equipment, pipe-racks, pipelines, pipes, cable-racks, cables and other conducting media;
piling and foundations;
process control building, power distribution buildings, process instrumentation buildings and analyser shelters;
process and utility equipment some of which may be within enclosed shelters including, instrument air compressor equipment, instrument air drier equipment, instrument air drier receiver equipment, emergency generator and fuel storage, fire water tank, fire water pump equipment, chemical dosing equipment and associated equipment;
pipe-racks and cable-racks and above and below ground pipelines, pipes, cables, ducts and other conducting media between works within this Work No. 5 and those comprised in Work Nos. 2 and 4;
road access from the highway at two locations on Laporte Road;
road access at one location from the unnamed private access road off Queens Road;
internal site roads, hard standing and parking areas;
drainage system, associated sumps and pumps and a water retention pond;
utilities, transformers and lighting infrastructure; and
fencing and gates.
Annotations
Commencement
- I1
Sch. 1 para. 5 in force at 27.2.2025, see art. 1
Notes on Part 1
Footnotes
- f1
-
There are amendments to section 14 which are not relevant to this Order.
- f2
-
2008 c. 29. Section 24(2)(a) was amended by section 33(3) of the Wales Act 2017 (c. 4).
- f3
-
2008 c. 29. Section 115(2) was amended by section 160(3) of the Housing and Planning Act 2016 (c. 22). There are other amendments to section 115 which are not relevant to this Order.