OpenLegislation

Article 2 Corrections

Original text. Later amendments are not shown.

The Brechfa Forest Wind Farm Connection Order 2016 is corrected as follows.

(1)

In Part 3 of Schedule 2 (Plans), substitute the table with the following—

“Access and rights of way plans

(1) Drawing title(2) Drawing number(3) Revision
Access and Rights of Way PlansSection A Key Plan – 15/WPD/021B
Access and Rights of Way PlansSection A Plan Series – 15/WPD/022B
Access and Rights of Way PlansSection B Key Plan – 15/WPD/023A
Access and Rights of Way PlansSection B Plan Series – 15/WPD/024A
Access and Rights of Way PlansSection C Key Plan – 15/WPD/025A
Access and Rights of Way PlansSection C Plan Series – 15/WPD/026A

”

(2)

In Part 5 of Schedule 2 (Plans), substitute the table with the following—

“Design drawings

(1)Drawing title(2)Drawing number(3)Revision
Key Plan for Design Drawings15/WPD/100A
132kV Overhead Line Work No. 1 Profiles15/WPD/106B
132kV Overhead Line Work No. 2 Profiles15/WPD/102A
132kV Overhead Line Wood Pole Outlines15/WPD/103A
Design Drawings 132kV Underground Cables15/WPD/104A

”

(3)

In Part 7 of Schedule 2 (Plans), substitute the table with the following—

“Heritage designations plans

(1)Drawing title(2)Drawing number(3)Revision
Key Plan for Heritage Designations (Section A)15/WPD/033B
Key Plan for Heritage Designations (Section B)15/WPD/035A
Key Plan for Heritage Designations (Section C)15/WPD/037A
Heritage Designations Plan (Section A)15/WPD/034B
Heritage Designations Plan (Section B)15/WPD/036A
Heritage Designations Plan (Section C)15/WPD/038A

”

(4)

In Part 8 of Schedule 2 (Plans), substitute the table with the following—

“Land plans

(1)Drawing title(2)Drawing number(3)Revision
Land PlansSection A Key Plan – 15/WPD/009B
Land PlansSection A Plan Series – 15/WPD/010D
Land PlansSection B Key Plan – 15/WPD/011A
Land PlansSection B Plan Series – 15/WPD/012D
Land PlansSection C Key Plan – 15/WPD/013A
Land PlansSection C Plan Series – 15/WPD/014C

”

(5)

In Part 9 of Schedule 2 (Plans), substitute the table with the following—

“Trees and Hedges with the potential to be affected plans

(1)Drawing title(2)Drawing number(3)Revision
Trees and Hedges with the Potential to be Affected PlansSection A Key Plan – 15/WPD/039B
Trees and Hedges with the Potential to be Affected PlansSection A Plan Series – 15/WPD/110B
Trees and Hedges with the Potential to be Affected PlansSection B Key Plan – 15/WPD/041A
Trees and Hedges with the Potential to be Affected PlansSection B Plan Series – 15/WPD/111A
Trees and Hedges with the Potential to be Affected PlansSection C Key Plan – 15/WPD/043A
Trees and Hedges with the Potential to be Affected PlansSection C Plan Series – 15/WPD/044A

”

(6)

In Part 10 of Schedule 2 (Plans), substitute the table with the following—

“Works plans

(1)Drawing title(2)Drawing number(3)Revision
Works PlansSection A Key Plan – 15/WPD/015B
Works PlansSection A Plan Series – 15/WPD/107D
Works PlansSection B Key Plan – 15/WPD/017A
Works PlansSection B Plan Series – 15/WPD/109B
Works PlansSection C Key Plan – 15/WPD/019A
Works PlansSection C Plan Series – 15/WPD/020B

”

(7)

In Requirement 5(4) of Schedule 3 (Requirements), replace “A/WP/PS/7” with “A/WP/PS/1 Sheet 7 of 7”,