The Brechfa Forest Wind Farm Connection (Correction) Order 2017

S.I. 2017/343 · Made 9 March 2017

Original text. legislation.gov.uk does not revise statutory instruments, so later amendments are not shown here. Changes made to it are listed under each provision when known.

Infrastructure Planning

Made 9th March 2017

Coming into force 10th March 2017

The Brechfa Forest Wind Farm Connection Order 2016 (the “Order”)f1, which granted development consent within the meaning of the Planning Act 2008 (“the Act”)f2, contains correctable errors within the meaning of the Act.

In accordance with paragraph 1(5)(a) of Schedule 4 to the Act, the Secretary of State received, before the end of the relevant period referred to in paragraph 1(6)(a) of that Schedule, a written request from Western Power Distribution (South Wales) Plc to correct errors in the Order. In accordance with paragraph 1(7) of that Schedule, the Secretary of State informed Carmarthenshire County Council that the request had been received.

The Secretary of State, in exercise of the powers conferred by paragraphs 1(4) and (8) of Schedule 4 to the Act, makes the following Order:

Annotations to the whole text

Footnotes

f1

S.I. 2016/987.

f2

2008 c.29. Paragraph 1 of Schedule 4 was amended by paragraph 70 of Schedule 13, and Part 20 of Schedule 25, to the Localism Act 2011 (c.20) and by paragraph 4 of Schedule 8 to the Marine and Coastal Access Act 2009 (c.23). There are other amendments to the Act which are not relevant to this Order.

Contents

  1. 1Citation and commencement
  2. 2Corrections
  3. Signature
  4. Explanatory note

1Citation and commencement

This Order may be cited as the Brechfa Forest Wind Farm Connection (Correction) Order 2017 and comes into force on 10th March 2017.

2Corrections

The Brechfa Forest Wind Farm Connection Order 2016 is corrected as follows.

(1)

In Part 3 of Schedule 2 (Plans), substitute the table with the following—

“Access and rights of way plans

(1) Drawing title(2) Drawing number(3) Revision
Access and Rights of Way PlansSection A Key Plan – 15/WPD/021B
Access and Rights of Way PlansSection A Plan Series – 15/WPD/022B
Access and Rights of Way PlansSection B Key Plan – 15/WPD/023A
Access and Rights of Way PlansSection B Plan Series – 15/WPD/024A
Access and Rights of Way PlansSection C Key Plan – 15/WPD/025A
Access and Rights of Way PlansSection C Plan Series – 15/WPD/026A

”

(2)

In Part 5 of Schedule 2 (Plans), substitute the table with the following—

“Design drawings

(1)Drawing title(2)Drawing number(3)Revision
Key Plan for Design Drawings15/WPD/100A
132kV Overhead Line Work No. 1 Profiles15/WPD/106B
132kV Overhead Line Work No. 2 Profiles15/WPD/102A
132kV Overhead Line Wood Pole Outlines15/WPD/103A
Design Drawings 132kV Underground Cables15/WPD/104A

”

(3)

In Part 7 of Schedule 2 (Plans), substitute the table with the following—

“Heritage designations plans

(1)Drawing title(2)Drawing number(3)Revision
Key Plan for Heritage Designations (Section A)15/WPD/033B
Key Plan for Heritage Designations (Section B)15/WPD/035A
Key Plan for Heritage Designations (Section C)15/WPD/037A
Heritage Designations Plan (Section A)15/WPD/034B
Heritage Designations Plan (Section B)15/WPD/036A
Heritage Designations Plan (Section C)15/WPD/038A

”

(4)

In Part 8 of Schedule 2 (Plans), substitute the table with the following—

“Land plans

(1)Drawing title(2)Drawing number(3)Revision
Land PlansSection A Key Plan – 15/WPD/009B
Land PlansSection A Plan Series – 15/WPD/010D
Land PlansSection B Key Plan – 15/WPD/011A
Land PlansSection B Plan Series – 15/WPD/012D
Land PlansSection C Key Plan – 15/WPD/013A
Land PlansSection C Plan Series – 15/WPD/014C

”

(5)

In Part 9 of Schedule 2 (Plans), substitute the table with the following—

“Trees and Hedges with the potential to be affected plans

(1)Drawing title(2)Drawing number(3)Revision
Trees and Hedges with the Potential to be Affected PlansSection A Key Plan – 15/WPD/039B
Trees and Hedges with the Potential to be Affected PlansSection A Plan Series – 15/WPD/110B
Trees and Hedges with the Potential to be Affected PlansSection B Key Plan – 15/WPD/041A
Trees and Hedges with the Potential to be Affected PlansSection B Plan Series – 15/WPD/111A
Trees and Hedges with the Potential to be Affected PlansSection C Key Plan – 15/WPD/043A
Trees and Hedges with the Potential to be Affected PlansSection C Plan Series – 15/WPD/044A

”

(6)

In Part 10 of Schedule 2 (Plans), substitute the table with the following—

“Works plans

(1)Drawing title(2)Drawing number(3)Revision
Works PlansSection A Key Plan – 15/WPD/015B
Works PlansSection A Plan Series – 15/WPD/107D
Works PlansSection B Key Plan – 15/WPD/017A
Works PlansSection B Plan Series – 15/WPD/109B
Works PlansSection C Key Plan – 15/WPD/019A
Works PlansSection C Plan Series – 15/WPD/020B

”

(7)

In Requirement 5(4) of Schedule 3 (Requirements), replace “A/WP/PS/7” with “A/WP/PS/1 Sheet 7 of 7”,

Signature

Signed by the authority of the Secretary of State for Business, Energy and Industrial Strategy

Giles Scott

Head of Energy Infrastructure Planning and Coal Liabilities

Department for Business, Energy and Industrial Strategy

9th March 2017

Explanatory note

(This note is not part of the Order)

This Order corrects errors in the Brechfa Forest Wind Farm Connection Order 2016, which granted development consent under the Planning Act 2008, following a written request from Western Power Distribution (South Wales) Plc under paragraph 1(5)(a) of Schedule 4 to that Act.