Regulation 25 Change control: regulator power to specify notifiable changes and major changesI1

England and Wales

The regulator may specify that a particular type of controlled change is a notifiable change or a major change, in relation to specified work, by giving notice in writing to that effect to the client, principal contractor (or sole contractor) and the principal designer (or sole or lead designer) for that work.

Annotations

Commencement

I1

Reg. 25 in force at 1.10.2023, see reg. 1(1)

Notes on Part 3

Modifications

C1

Pts. 2-6 excluded (temp.) (6.4.2024) by The Building (Registered Building Control Approvers etc.) (England) Regulations 2024 (S.I. 2024/110), regs. 1(3), 46(2)(c)