Regulation 37 Mandatory occurrence reporting: client duty on appointment of principal contractor or principal designerI1

England and Wales

Where, in relation to HRB work, a stage of HRB work or work to existing HRB, the client appoints a principal contractor (or sole contractor) or principal designer (or sole or lead designer), then the client must take all reasonable steps to satisfy itself that the person appointed is able to fulfil the requirements in regulations 32 (mandatory occurrence reporting system) and 33 (mandatory occurrence reporting: reporting to the regulator).

Annotations

Commencement

I1

Reg. 37 in force at 1.10.2023, see reg. 1(1)

Notes on Part 4

Modifications

C1

Pts. 2-6 excluded (temp.) (6.4.2024) by The Building (Registered Building Control Approvers etc.) (England) Regulations 2024 (S.I. 2024/110), regs. 1(3), 46(2)(c)