Regulation 37 Mandatory occurrence reporting: client duty on appointment of principal contractor or principal designerI1
England and Wales
Where, in relation to HRB work, a stage of HRB work or work to existing HRB, the client appoints a principal contractor (or sole contractor) or principal designer (or sole or lead designer), then the client must take all reasonable steps to satisfy itself that the person appointed is able to fulfil the requirements in regulations 32 (mandatory occurrence reporting system) and 33 (mandatory occurrence reporting: reporting to the regulator).
Annotations
Commencement
Notes on Part 4
Modifications
- C1
Pts. 2-6 excluded (temp.) (6.4.2024) by The Building (Registered Building Control Approvers etc.) (England) Regulations 2024 (S.I. 2024/110), regs. 1(3), 46(2)(c)