Regulation 8 Building control authority’s power to require notifications etc. for HRB work or stage of HRB workI1
England and Wales
(1)
The building control authority may, by notice in writing, require a client—
(a)
to notify the building control authority, within a specified period, when a specified point of the HRB work or a specified point of the stage of HRB work has been reached;
(b)
not to cover up specified work for a specified period.
(2)
In this regulation, “specified” means specified by the building control authority in the notice referred to in paragraph (1).