Regulation 13 Form, grounds and period for rejecting final certificateI1

England and Wales

Changes not yet applied. Later legislation changes this provision in ways not yet written into the text below:

(1)

The prescribed form of a final certificatef1 is form 5 in Schedule 1.

(2)

The grounds on which a local authority must reject a final certificate are those prescribed in Schedule 4 and the form to be used for rejecting a final certificate is form 7 in Schedule 1.

(3)

The period within which a local authority may give notice of rejection of a final certificate is ten working days beginning with the day on which the certificate is given.

(4)

A final certificate given by an approver to a local authority in accordance with these Regulations is evidence (but not conclusive evidence) that the requirements specified in the certificate have been complied with.

Annotations

Commencement

I1

Reg. 13 in force at 6.4.2024, see reg. 1(3)

Footnotes

f1

For the definition of “final certificate” see section 51 of the Building Act 1984.