Paragraph 1 E1

England

Work consisting of—

F1(a)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(b)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(c)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(d)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(e)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(f)

in relation to an existing fixed building service, which is not a fixed internal or external lighting system—

(i)

replacing any part which is not a combustion appliance,

(ii)

adding an output device, or

(iii)

adding a control device,

where F2testing and adjustment of the work is not possible or would not affect the use by the fixed building service of no more fuel and power than is reasonable in the circumstances;

(g)

providing a self-contained fixed building service, which is not a fixed internal or external lighting system, where—

(i)

it is not a combustion appliance F3(other than a fixed flueless gas cooker),

(ii)

any electrical work associated with its provision is exempt from the requirement to give a building notice or F4an application for building control approval with full plans by virtue of regulation 9 or F512(6A),

(iii)

testing and adjustment is not possible or would not affect its energy efficiency, and

(iv)

in the case of a mechanical ventilation appliance, the appliance is not installed in a room containing an open-flued combustion appliance whose combustion products are discharged through a natural draught flue;

(h)

replacing an external door (where the door together with its frame has not more than 50% of its internal face area glazed);

(i)

in existing buildings other than dwellings, providing fixed internal lighting where no more than 100m2 of the floor area of the building is to be served by the lighting;

(j)

replacing—

(i)

a sanitary convenience with one that uses no more water than the one it replaces,

(ii)

a washbasin, sink or bidet,

(iii)

a fixed bath,

(iv)

a shower,

(v)

a rainwater gutter, or

(vi)

a rainwater downpipe,

where the work does not include any work to underground drainage, and includes no work to the hot or cold water system or above ground drainage, which may prejudice the health or safety of any person on completion of the work;

(k)

in relation to an existing cold water supply—

(i)

replacing any part,

(ii)

adding an output device, or

(iii)

adding a control device;

(l)

providing a hot water storage system that has a storage vessel with a capacity not exceeding 15 litres, where any electrical work associated with its provision is exempt from the requirement to give a building notice or F6an application for building control approval with full plans by virtue of regulation 9 or 12(6)(b);

(m)

installation of thermal insulation in a roof space or loft space where—

(i)

the work consists solely of the installation of such insulation, and

(ii)

the work is not carried out in order to comply with any requirement of these Regulations.

Annotations

Textual amendments

F1

Sch. 4 para. 1(a)-(e) omitted (E., but only in relation to excepted energy buildings in W.) (6.4.2013) by virtue of The Building Regulations &c. (Amendment) Regulations 2012 (S.I. 2012/3119), reg. 32(a)(i), Sch. 1 (with regs. 1(3), 45-47) (as amended by S.I. 2013/181, reg. 5, Sch.) [Editorial note: This amendment no longer applies at all in relation to W. from 8.6.2018]

F2

Word in Sch. 4 para. 1(f) substituted (15.7.2011) by The Building (Amendment) Regulations 2011 (S.I. 2011/1515), regs. 1(2), 3(6)

F3

Words in Sch. 4 para. 1(g)(i) added (E., but only in relation to excepted energy buildings in W.) (6.4.2014) by The Building Regulations &c. (Amendment) Regulations 2014 (S.I. 2014/579), regs. 1(4), 2(11)(a) (with reg. 1(3)) [Editorial note: This amendment no longer applies at all in relation to W. from 8.6.2018]

F4

Words in Sch. 4 para. 1(g)(ii) substituted (E.) (1.10.2023) by The Building Regulations etc. (Amendment) (England) Regulations 2023 (S.I. 2023/911), regs. 1(2), 7(23)(b) (with regs. 22-24)

F5

Word in Sch. 4 para. 1(g)(ii) substituted (E., but only in relation to excepted energy buildings in W.) (6.4.2014) by The Building Regulations &c. (Amendment) Regulations 2014 (S.I. 2014/579), regs. 1(4), 2(11)(b) (with reg. 1(3)) [Editorial note: This amendment no longer applies at all in relation to W. from 8.6.2018]

F6

Words in Sch. 4 para. 1(l) substituted (E.) (1.10.2023) by The Building Regulations etc. (Amendment) (England) Regulations 2023 (S.I. 2023/911), regs. 1(2), 7(23)(c) (with regs. 22-24)

Extent

E1

This version of this provision applies to England only; a separate version has been created for Wales only

Notes on Schedule 4

Textual amendments

F1

Words in Sch. 4 heading substituted (W.) (1.7.2026) by The Building etc. (Amendment) (No. 2) (Wales) Regulations 2025 (S.I. 2025/1320), regs. 1(2), 6(24)(a) (with reg. 19)

F2

Words in Sch. 4 heading substituted (E.) (1.10.2023) by virtue of The Building Regulations etc. (Amendment) (England) Regulations 2023 (S.I. 2023/911), regs. 1(2), 7(23)(a) (with regs. 22-24)