Regulation 11 Transitional provision: new higher-risk building work

England and Wales

(1)

Any new higher-risk building work must be overseen by the F1building control authority on or after 6 April 2024.

(2)

Initial notices for higher-risk building work must not be submitted to a local authority by an approved inspector or a registered building control authority on or after 6 April 2024.

(3)

For the purposes of paragraph (1), new higher-risk building work means higher-risk building work which is not already detailed in an initial notice F2only relating to building work submitted and accepted, or deemed to be accepted, before 6 April 2024.

F3(4)

In paragraph (1), “building control authority” means the local authority as stated in section 121A of the Building Act 1984.

Annotations

Textual amendments

F1

Words in reg. 11(1) substituted (1.7.2026) by The Building Safety Act 2022 (Consequential Amendments) (Wales) Regulations 2026 (W.S.I. 2026/55), regs. 1(2), 11(2)(a) (with reg. 13)

F2

Words in reg. 11(3) inserted (1.1.2025) by The Building (Registered Building Control Approvers etc.) (Wales) Regulations 2024 (S.I. 2024/1268), regs. 1(2), 42(4)

F3

Reg. 11(4) inserted (1.7.2026) by The Building Safety Act 2022 (Consequential Amendments) (Wales) Regulations 2026 (W.S.I. 2026/55), regs. 1(2), 11(2)(b) (with reg. 13)