Regulation 5 Cableway installations: duties of the main contractor
(1)
A person must not carry out or permit to be carried out works for the construction or modification of a cableway installation otherwise than under and in accordance with a stage 1 authorisation.
(2)
The main contractor is responsible for carrying out the safety analysis and preparing the safety report required under Article 8 of Regulation 2016/424/EU.
(3)
The instruction manual and the corresponding notes relating to the cableway installation must be drawn up in English.
(4)