Article 6 Power to deviateI1
England and Wales
Subject to paragraph (2), in constructing or maintaining the authorised development comprising works numbered 1 to 14B in Schedule 1 (authorised works), the undertaker may deviate laterally from the lines or situations shown on the works plan only to the extent of the limits of deviation shown on that plan.
In constructing and maintaining Work No. 2A or 2B the undertaker may—
deviate from the commencement and termination points specified for each of the cable routes referred to in the first column of the Tables comprised within the description of those Works, and
within the limits of deviation, construct and maintain those cable routes between the commencement and termination points so shown in the Tables.
Annotations
Commencement
- I1
Art. 6 in force at 2.10.2014, see art. 1