The Construction (Design and Management) Regulations 2015
S.I. 2015/51 · Made 22 January 2015 · Extends to United Kingdom
Health And Safety
Made 22nd January 2015
Laid before Parliament 29th January 2015
Coming into force 6th April 2015
The Secretary of State makes these Regulations in exercise of the powers conferred by sections 15(1), (2), (3)(a) and (c), (5)(a), (8) and (9), 80(1) and (2)(c) and 82(3)(a) of, and paragraphs 1(1) and (2), 6 to12, 14, 15(1), 16, 18, 20 and 21 of Schedule 3 to, the Health and Safety at Work etc. Act 1974 M1 (“the 1974 Act”).
The Regulations give effect without modifications to proposals submitted to the Secretary of State by the Health and Safety Executive (“the Executive”) under section 11(3) of the 1974 Act M2.
Before submitting those proposals to the Secretary of State, the Executive consulted the bodies that appeared to it to be appropriate as required by section 50(3) of the 1974 Act M3.
It appears to the Secretary of State that the modifications to the instruments marked with an asterisk in the table in Schedule 5 are expedient for the purposes of section 80(1) of the 1974 Act. It also appears to the Secretary of State not to be appropriate to consult bodies in respect of those modifications for the purposes of section 80(4) M4 of the 1974 Act.
Annotations to the whole text
Marginal citations
- M1
1974 c.37. Section 15(1) was substituted by paragraph 6 of Schedule 15 to the Employment Protection Act 1975 (c.71) and amended by S.I. 2002/794. Section 15(2) and (3)(c) was amended by paragraphs 1 and 5 of Schedule 12 to the Energy Act 2013 (c.32).
- M2
Section 11(3) was inserted by S.I. 2008/960.
- M3
Section 50(3) was amended by paragraph 16 of Schedule 15 to the Employment Protection Act 1975 (c.71), S.I. 2008/960, paragraphs 4 and 6 of Schedule 7 to the Health and Social Care Act 2012 (c.7), and by paragraphs 1 and 11(1) of Schedule 12 to the Energy Act 2013.
- M4
Section 80(4) was amended by S.I. 2002/794.
Contents
- Part 1: Introduction
- 1Citation and commencement
- 2Interpretation
- 3Application in and outside Great Britain
- Part 2: Client duties
- 4Client duties in relation to managing projects
- 5Appointment of the principal designer and the principal contractor
- 6Notification
- 7Application to domestic clients
- Part 3: Health and safety duties and roles
- 8General duties
- 9Duties of designers
- 10Designs prepared or modified outside Great Britain
- 11Duties of a principal designer in relation to health and safety at the pre-construction phase
- 12Construction phase plan and health and safety file
- 13Duties of a principal contractor in relation to health and safety at the construction phase
- 14Principal contractor's duties to consult and engage with workers
- 15Duties of contractors
- Part 4: General requirements for all construction sites
- 16Application of Part 4
- 17Safe places of construction work
- 18Good order and site security
- 19Stability of structures
- 20Demolition or dismantling
- 21Explosives
- 22Excavations
- 23Cofferdams and caissons
- 24Reports of inspections
- 25Energy distribution installations
- 26Prevention of drowning
- 27Traffic routes
- 28Vehicles
- 29Prevention of risk from fire, flooding or asphyxiation
- 30Emergency procedures
- 31Emergency routes and exits
- 32Fire detection and fire-fighting
- 33Fresh air
- 34Temperature and weather protection
- 35Lighting
- Part 5: General
- 36Enforcement in respect of fire
- 37Transitional and saving provisions
- 38Revocation and consequential amendments
- 39Review
- Signature
- Schedule 1: Particulars to be notified under regulation 6
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- 11Paragraph 11
- 12Paragraph 12
- 13Paragraph 13
- 14Paragraph 14
- 15Paragraph 15
- Schedule 2: Minimum welfare facilities required for construction sites
- 1Sanitary conveniences
- 2Washing facilities
- 3Drinking water
- 4Changing rooms and lockers
- 5Facilities for rest
- Schedule 3: Work involving particular risks
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- Schedule 4: Transitional and saving provisions
- 1Paragraph 1
- 2Paragraph 2
- 3Projects with no existing CDM co-ordinator or principal contractor
- 4Projects with an existing CDM co-ordinator
- 5Duties of CDM co-ordinator during transitional period
- 6Duties disapplied pending appointment of principal designer
- 7Projects with only one contractor
- 8Savings
- Schedule 5Amendments
- Explanatory note