OpenLegislation

Regulation 20 Demolition or dismantling

(1)

The demolition or dismantling of a structure must be planned and carried out in such a manner as to prevent danger or, where it is not practicable to prevent it, to reduce danger to as low a level as is reasonably practicable.

(2)

The arrangements for carrying out such demolition or dismantling must be recorded in writing before the demolition or dismantling work begins.