Schedule 16 DESIGN PARAMETERSI1

England and Wales

(1)

Component/Building/Area

(2)

Works Area

(3)

Maximum Number

(4)

Maximum Height (m) of Component/ Building/ Area

(5)

Maximum Height (m)

(6)

Further Parameters

Direct Contact Cooler1A23033 Above Ordnance Datum-
Absorber Column(s) and Stack(s)1B2 combined Absorber Columns and Stacks or a maximum of 2 Absorber Columns and 2 Stacks110113 Above Ordnance Datum

Minimum vertical distance between top of Absorber Column(s) and top of Stack(s) whether combined or separate – 30m

Minimum height of the top of Stack(s) – 100m from development platform as built

Where there are 2 Stacks: Maximum internal diameter of Stack associated with Riverside 1: 3.1m

Maximum internal diameter of Stack associated with Riverside 2: 2.5m

Where there is 1 Stack: Maximum internal diameter of Stack: 4.0m

Regenerator1A26063 Above Ordnance Datum-
Compression Plant1C24548 Above Ordnance Datum-
CO2 Dehydration1C22528 Above Ordnance Datum-
CO2 Liquefaction1C23033 Above Ordnance Datum-
CO2 Vents1C24548 Above Ordnance Datum-
LCO₂ Buffer Storage Area1D164548 Above Ordnance Datum-
Hybrid or Dry Cooling Tower1E23235 Above Ordnance Datum-
Water Treatment Plant and Wastewater Treatment Plant1E22023 Above Ordnance Datum-
Back Pressure Turbine and Generator1A23538 Above Ordnance Datum-
Insulated heat pipework and flue gas ducting2A(ii) and 2b(i)-3033 Above Ordnance Datum-
Loading platform (not including topside infrastructure and equipment)4C1-11.5 Above Chart Datum

Maximum length of 40 metres

Maximum width of 50 metres

Breasting Dolphins4B4-11.5 Above Chart Datum-
Mooring Dolphins4B6-11.5 Above Chart Datum

Maximum length of 7 metres

Maximum width of 7 metres

Access Trestle Start Point (not including topside infrastructure and equipment)4B1-20 Above Ordnance Datum

Maximum length of 335 metres

Maximum width of 10 metres

LCO2 pipelines, piperacks and pipe bridges5-3033 Above Ordnance Datum-