In this Schedule—

  • “utility works” means works to install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain underground electrical cables, earthing cable, optical fibre cable, data cable, telecommunications cable, flue gas pipework, condensate pipework, water supply pipework, foul water pipework, drains, sewers, heat pipes, LCO₂ pipework, and other apparatus and services, and associated works including bays, ducts, protection and safety measures and equipment, and other apparatus and structures.

    (1)

    Area

    (2)

    Streets subject to street works

    (3)

    Description of the street works

    London Borough of BexleyNorman RoadUtility works beneath the width of the highway shown by a blue and black dashed line on the access and rights of way plan, from point E to point L.
    London Borough of BexleyNorman RoadUtility works beneath the width of the highway shown by a blue and black dashed line on the access and rights of way plan, from point L to point O.
    London Borough of BexleyNorman RoadUtility works beneath the width of the highway shown by a blue and black dashed line on the access and rights of way plan, from point L to point P.
    London Borough of BexleyA2016 Picardy ManorwayUtility works beneath the width of the highway shown by a blue and black dashed line on the access and rights of way plan, from point O to point N.
    London Borough of BexleyA2016 Picardy ManorwayUtility works beneath the width of the highway shown by a blue and black dashed line on the access and rights of way plan, from point P to point Q.

Annotations

Commencement

I1

Sch. 4 para. 1 in force at 27.11.2025, see art. 1