Paragraph 1 InterpretationI1
England and Wales
In this Schedule—
-
“utility works” means works to install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain underground electrical cables, earthing cable, optical fibre cable, data cable, telecommunications cable, flue gas pipework, condensate pipework, water supply pipework, foul water pipework, drains, sewers, heat pipes, LCO₂ pipework, and other apparatus and services, and associated works including bays, ducts, protection and safety measures and equipment, and other apparatus and structures.
(1)
Area
(2)
Streets subject to street works
(3)
Description of the street works
London Borough of Bexley Norman Road Utility works beneath the width of the highway shown by a blue and black dashed line on the access and rights of way plan, from point E to point L. London Borough of Bexley Norman Road Utility works beneath the width of the highway shown by a blue and black dashed line on the access and rights of way plan, from point L to point O. London Borough of Bexley Norman Road Utility works beneath the width of the highway shown by a blue and black dashed line on the access and rights of way plan, from point L to point P. London Borough of Bexley A2016 Picardy Manorway Utility works beneath the width of the highway shown by a blue and black dashed line on the access and rights of way plan, from point O to point N. London Borough of Bexley A2016 Picardy Manorway Utility works beneath the width of the highway shown by a blue and black dashed line on the access and rights of way plan, from point P to point Q.
Annotations
Commencement
- I1
Sch. 4 para. 1 in force at 27.11.2025, see art. 1