S.I. 1987/251 · Made 18 February 1987

Original text. legislation.gov.uk does not revise statutory instruments, so later amendments are not shown here. Changes made to it are listed under each provision when known.

HIGHWAYS, ENGLAND AND WALES

Made 18th February 1987

The Secretary of State for Transport makes this Instrument in exercise of powers conferred by section 106(3) of the Highways Act 1980f1, and now vested in himf2, and of all other enabling powers:

Annotations to the whole text

Footnotes

f1

1980 c. 66.

f2

S.I. 1981/238.

Contents

  1. 1Section 1
  2. 2Section 2
  3. 3Section 3
  4. 4Section 4
  5. Signature
  6. Schedule THE SCHEDULE TO THE INSTRUMENTTHE COUNTY COUNCIL OF WEST MIDLANDS (BLACK COUNTRY ROUTE) (BRIDGE OVER BIRMINGHAM CANAL (WOLVERHAMPTON LEVEL)) SCHEME 1985
  7. Schedule TO THE SCHEMEPLANS AND SPECIFICATIONS OF THE PROPOSED BLACK COUNTRY ROUTE BRIDGE OVER BIRMINGHAM CANAL (WOLVERHAMPTON LEVEL)

1

The County Council of West Midlands (Black Country Route) (Bridge over Birmingham Canal (Wolverhampton Level)) Scheme 1985 is hereby confirmed with modifications.

2

The said Scheme as confirmed (hereinafter referred to as “the Scheme”) is set out in the Schedule hereto. Copies of the Scheme with its accompanying plan are deposited at the offices of the Department of Transport, Romney House, 43 Marsham Street, London SW1 3PY, and at the offices of The Metropolitan Borough Council of Wolverhampton, Civic Centre, Wolverhampton; at the Walsall Metropolitan Borough Council, Civic Centre, Walsall and at the Department of Transport, West Midlands Regional Office, Five Ways Tower, Frederick Road, Edgbaston, Birmingham B15 1SJ.

3

The Scheme will come into force on the date on which notice that it has been confirmed is first published in accordance with paragraph 1 of Schedule 2 to the Highways Act 1980.

4

This Instrument may be cited as the County Council of West Midlands (Black Country Route) (Bridge over Birmingham Canal (Wolverhampton Level)) Scheme 1985 Confirmation Instrument 1987.

Signature

Signed by authority of the Secretary of State.

Hugh Ellis-Rees

Regional Director West Midlands Region

Department of Transport

18th February 1987

Schedule THE SCHEDULE TO THE INSTRUMENTTHE COUNTY COUNCIL OF WEST MIDLANDS (BLACK COUNTRY ROUTE) (BRIDGE OVER BIRMINGHAM CANAL (WOLVERHAMPTON LEVEL)) SCHEME 1985

The County Council of West Midlands (hereinafter referred to as “the Council”) make this Scheme in exercise of their powers under Section 106(3) of the Highways Act 1980 and of all other enabling powers:

1

The Council are authorised to construct over the navigable waters of the Birmingham Canal (Wolverhampton Level) the bridge specified in the Schedule to this Scheme as part of the highway which they are proposing to construct from a point on Birmingham New Road 140 metres north west of its junction with Anchor Lane and Meadow Lane in the district of Wolverhampton to the roundabout at Junction 10 of the M6 Motorway in the district of Walsall all in the County of West Midlands.

2

This Scheme may be cited as The County Council of West Midlands (Black Country Route) (Bridge over Birmingham Canal (Wolverhampton Level)) Scheme 1985.

Schedule TO THE SCHEMEPLANS AND SPECIFICATIONS OF THE PROPOSED BLACK COUNTRY ROUTE BRIDGE OVER BIRMINGHAM CANAL (WOLVERHAMPTON LEVEL)

The bridge will have 4 spans each with distances of 25.75 metres and shown on Drawing B of the said Plan.