Paragraph 3 Details of licensed marine activities

Original text. Later amendments are not shown.

Such activities are authorised in relation to the construction, maintenance and operation of—

Work No. 1A—

(a)

an offshore wind turbine generating station with a gross electrical output of over 100 megawatts comprising up to 100 wind turbine generators each fixed to the seabed by monopile or jacket foundations; and

(b)

a network of HVAC subsea cables connecting the wind turbine generators and Work No. 2A within the area shown on the works plans, including cable crossings and cable protection;

Work No. 4A—

Up to one accommodation platform fixed to the seabed by jacket or monopile foundations within the area shown on the works plans;

Work No. 7A—

A temporary work area associated with Work Nos. 1A to 5A for vessels to carry out intrusive activities and non-intrusive activities alongside Work Nos. 1A to 5A;

In connection with such Work Nos. 1A, 4A and 7A and to the extent that they do not otherwise form part of any such work, further associated development comprising such other works as may be necessary or expedient for the purposes of or in connection with the relevant part of the authorised scheme and which fall within the scope of the work assessed by the environmental statement and the provisions of this licence, including—

(a)

scour protection around the foundations of the offshore structures;

(b)

cable protection measures such as the placement of rock and/or concrete mattresses, with or without frond devices;

(c)

the removal of material from the seabed required for the construction of Work Nos. 1A, and 4A and the disposal of inert material of natural origin within the Order limits produced during construction drilling, seabed preparation for foundation works, cable installation preparation such as sandwave clearance, and boulder clearance;

(d)

removal of static fishing equipment;

(e)

temporary landing places, moorings or other means of accommodating vessels in the construction or maintenance of the authorised scheme;

(f)

disposal of drill arisings in connection with any foundation drilling up to a total of 35,086 cubic metres;

(g)

creation and use of temporary laydown areas, use of cable lay vessel anchors; and

(h)

lighting.