Part 2 Conditions
Wind turbine generators
Subject to sub-paragraph (2), wind turbine generators forming part of the authorised scheme must not—
exceed a height of 376.8 metres when measured from MHWS to the tip of the vertical blade;
exceed a rotor diameter of 344.08 metres;
be less than 830 metres from the nearest wind turbine generator in any direction;
have a distance of less than 34 metres between the lowest point of the rotating blade of the wind turbine generator and mean sea level; or
exceed 100 wind turbine generators.
References to the location of a wind turbine generator are references to the centre point at the base of the wind turbine generator.
Wind turbine generator foundations
Wind turbine generator foundations must be of one or more of the following foundation options: piled monopile, or piled jacket foundation.
Any wind turbine generator piled monopile foundation must not have a pile diameter exceeding 15 metres.
Any wind turbine generator piled jacket foundation must not have—
more than four legs;
more than four piles; or
a pile diameter exceeding four metres.
Within Work No. 1B, the wind turbine generator foundations must not have—
a total combined seabed footprint (including scour protection) exceeding 311,725 square metres; or
a total combined amount of scour protection exceeding 302,221.21 square metres.
Offshore accommodation platform dimensions
The total number of offshore accommodation platforms in respect of the authorised scheme must not exceed one.
The dimensions of any offshore accommodation platform (excluding helidecks, lightning protection, towers, masts and cranes) must not exceed—
125 metres in length;
100 metres in width; or
105 metres in height above LAT.
Offshore accommodation platformfoundations
Offshore accommodation platform foundations must be of one or more of the following foundation options: piled monopile or piled jacket foundation.
The pile diameter of any offshore accommodation platform piled monopile foundation must not exceed 15 metres.
Any offshore accommodation platform piled jacket foundation must not have—
more than eight legs;
more than eight piles; or
a pile diameter exceeding 3.8 metres.
Any offshore accommodation platform foundation must not have—
a seabed footprint (including scour protection) exceeding 5,411 square metres; or
a seabed footprint (excluding scour protection) exceeding 177 square metres.
The total volume of scour protection for wind turbine generators and the offshore accommodation platform must not exceed 548,095 cubic metres.
Cables and cable protection
Within Work No. 1B the array cables must not, in total—
exceed 350 kilometres in length;
exceed 20 cable crossings;
have cable protection (including cable crossings) exceeding 375,800 square metres in area; or
have cable protection (including cable crossings) exceeding 219,115 cubic metres in volume.
The array cables within Work No. 1B which fall within the Dogger Bank Special Area of Conservation must not have cable protection exceeding 10% of the length of such cables, when combined with the offshore export cables, array cables and inter-platform cables authorised by the licences granted under Schedules 10 and 12 to 14A of the Order.
- 15Phases of authorised scheme
- 16Maintenance of the authorised scheme
- 17Extension of time periods
- 18Notifications and inspections
- 19Aids to navigation
- 20Colouring of Structures
- 21Aviation safety
- 22Chemicals, drilling and debris
- 23Force majeure
- 24Pre-construction plans and documentation
- 25Site Integrity Plan
- 26Approval of programmes, statements etc.
- 27Offshore safety management
- 28Reporting of engaged agents, contractors and vessels
- 29Pre-construction monitoring and surveys
- 30Construction monitoring and surveys
- 31Post-construction monitoring and surveys
- 32Reporting of scour and cable protection
- 33Completion of construction
- 34Collaboration
- 35Reporting of impact pile driving
- 36Maintenance reporting
- 37Sediment Sampling
- 38Ornithological monitoring
- 39Noise restriction