Paragraph 27 Pre-construction monitoring and surveys

Original text. Later amendments are not shown.

(1)

The undertaker must, in discharging condition 13(1)(b), submit a monitoring plan or plans in accordance with the in principle monitoring plan for written approval in writing by the MMO in consultation with the relevant statutory nature conservation body, which must contain details of proposed monitoring and surveys, including methodologies and timings, and a proposed format and content for a pre-construction baseline report.

(2)

The survey proposals submitted under sub-paragraph (1) must be in accordance with the principles set out in the in principle monitoring plan and must specify each survey’s objectives and explain how it will assist in either informing a useful and valid comparison with the post-construction position and/or will enable the validation or otherwise of key predictions in the environmental statement.

(3)

The baseline report proposals submitted under sub-paragraph (1) must ensure that the outcome of the agreed surveys, together with existing data and reports, are drawn together to present a valid statement of the pre-construction position, with any limitations, and must make clear what post-construction comparison is intended and the justification for this being required.

(4)

The pre-construction surveys referred to in sub-paragraph (1) must, unless otherwise agreed in writing with the MMO, include, but not be limited to, the need to undertake—

(a)

a survey to determine the location, extent and composition of habitats of principal importance, Annex I subtidal habitat, habitat with suitability for sandeel or surficial deposits of glacial till in the parts of the Order limits in which it is proposed to carry out construction works;

(b)

a swath-bathymetry survey to IHO Order 1a standard that meets the requirements MGN654 and its annexes, and side scan sonar, of the area(s) within the Order limits in which it is proposed to carry out construction works including an appropriate buffer around the location of each work;

(c)

undertake any monitoring required by the SIP submitted in accordance with condition 14;

(d)

undertake or contribute to any marine mammal monitoring referred to in the marine mammal mitigation protocol submitted in accordance with condition 13(1)(g);

(e)

any marine mammal monitoring required by the monitoring plan submitted in accordance with condition 13(1)(b), including information on indirect effects;

(f)

any sandeel monitoring required by the monitoring plan submitted in accordance with condition 13(1)(b), including information on indirect effects;

(g)

any benthic monitoring required by the monitoring plan submitted in accordance with condition 13(1)(b); and

(h)

any marine processes monitoring required by the monitoring plan submitted in accordance with condition 13(1)(b).

(5)

The undertaker must carry out the surveys specified within the monitoring plan or plans in accordance with that plan or plans, unless otherwise agreed in writing by the MMO in consultation with the relevant statutory nature conservation body.

(6)

When any surveys are carried out in accordance with sub-paragraph (5) a survey report must be submitted to the MMO following completion of the relevant survey. Any report submitted under this sub-paragraph must be submitted prior to the commencement of licensed activities for the relevant stage.

(7)

All monitoring reports must be made publicly available and submitted to relevant evidence databases (as agreed with the MMO) no later than six months following written approval of the relevant report by the MMO under this condition, unless otherwise agreed in writing by the MMO.