Part 2 Conditions

Original text. Later amendments are not shown.

Offshore converter platform dimensions

10
(1)

The total number of offshore converter platforms in respect of the authorised scheme must not exceed one.

(2)

The dimensions of any offshore converter platform (excluding helidecks, lightning protection, towers, masts and cranes) must not exceed—

(a)

125 metres in length;

(b)

100 metres in width; or

(c)

105 metres in height above LAT.

Offshore converter platform foundations

11
(1)

Offshore converter platform foundations must be of one or more of the following foundation options: piled monopile or piled jacket foundation.

(2)

The pile diameter of any offshore converter platform piled monopile foundation must not exceed 15 metres.

(3)

Any offshore converter platform piled jacket foundation must not have—

(a)

more than eight legs;

(b)

more than eight piles; or

(c)

a pile diameter exceeding 3.8 metres.

(4)

Any offshore converter platform foundation must not have—

(a)

a seabed footprint (including scour protection) exceeding 5,411 square metres; or

(b)

a seabed footprint (excluding scour protection) exceeding 177 square metres.

(5)

Within Work No. 2A, the offshore converter platform foundations must not have—

(a)

a total combined seabed footprint (including scour protection) exceeding 5,411 square metres; or

(b)

a total combined amount of scour protection exceeding 5,234 square metres.

(6)

The total volume of scour protection for offshore converter platforms in respect of the authorised scheme must not exceed 9,450 cubic metres.

Cables and cable protection

12
(1)

Within Work No. 3A, the offshore export cables must not, in total—

(a)

exceed 2 in number;

(b)

exceed 376 kilometres in length;

(c)

exceed 12 cable crossings;

(d)

have cable protection (including cable crossings) exceeding 576,021 square metres in area; or

(e)

have cable protection (including cable crossings) exceeding 522,615 cubic metres in volume.

(2)

The offshore export cables within Work No. 3A which fall within the Dogger Bank Special Area of Conservation must not have cable protection exceeding 10% of the length of such cables, when combined with the offshore export cables, array cables and inter-platform cables authorised by the licences granted under Schedules 10, 11 and 13 to 14A of the Order.

(3)

Within the area between MHWS and 350 metres seaward of MLWS, all offshore export cables must be buried, and must not have cable protection.

(4)

The offshore export cables within the area between 350 metres seaward of MLWS and the 10 metre depth contour as measured against LAT (as at the date of commencement of construction of the licensed activities) must not have cable protection exceeding 10% of the length of such cables, when combined with the offshore export cables authorised by the licence granted under Schedule 13 of the Order.

(5)

Within Work No. 2A the inter-platform cables must not, in total—

(a)

exceed 1 in number;

(b)

exceed 23 kilometres in length;

(c)

exceed 1 cable crossings;

(d)

have cable protection (including cable crossings) exceeding 43,203 square metres in area; or

(e)

have cable protection (including cable crossings) exceeding 39,207 cubic metres in volume.

  1. 13Phases of authorised scheme
  2. 14Maintenance of the authorised scheme
  3. 15Extension of time periods
  4. 16Notifications and inspections
  5. 17Aids to navigation
  6. 18Colouring of Structures
  7. 19Aviation safety
  8. 20Chemicals, drilling and debris
  9. 21Force majeure
  10. 22Pre-construction plans and documentation
  11. 23Site Integrity Plan
  12. 24Approval of programmes, statements etc.
  13. 25Offshore safety management
  14. 26Reporting of engaged agents, contractors and vessels
  15. 27Pre-construction monitoring and surveys
  16. 28Construction monitoring and surveys
  17. 29Post-construction monitoring and surveys
  18. 30Reporting of scour and cable protection
  19. 31Completion of construction
  20. 32Collaboration
  21. 33Reporting of impact pile driving
  22. 34Maintenance reporting
  23. 35Sediment Sampling
  24. 36Noise restriction
  25. 37Export cable restriction