Paragraph 10 I1
(1)
Within Work No. 1A, the HVAC cables must not, in total,—
(a)
exceed 1,270 kilometres in length;
(b)
have cable protection (excluding cable crossings) exceeding 660,000 square metres in area;
(c)
have cable protection (excluding cable crossings) exceeding 413,000 cubic metres in volume.
(2)
Within Work No. 1B, the HVAC cables must not, in total,—
(a)
exceed 1,270 kilometres in length;
(b)
have cable protection (excluding cable crossings) exceeding 890,000 square metres in area;
(c)
have cable protection (excluding cable crossings) exceeding 572,000 cubic metres in volume.
Annotations
Commencement
- I1
Sch. 1 Pt. 3 para. 10 in force at 26.8.2015, see art. 1