Paragraph 11 I1
(1)
Within Work No. 1A, the HVAC cable crossings must not, in total, exceed—
(a)
24 in number;
(b)
132,700 cubic metres in volume of cable crossing material;
(c)
147,100 square metres in seabed footprint.
(2)
Within Work No. 1B the HVAC cable crossings must not, in total, exceed—
(a)
24 in number;
(b)
132,700 cubic metres in volume of cable crossing material;
(c)
147,100 square metres in seabed footprint.
Annotations
Commencement
- I1
Sch. 1 Pt. 3 para. 11 in force at 26.8.2015, see art. 1