OpenLegislation

Paragraph 12 I1

(1)

Within Work Nos. 1A and 2A, the HVDC cable crossings must not, in total, exceed—

(a)

16 in number;

(b)

88,450 cubic metres in volume of cable crossing material;

(c)

98,100 square metres in seabed footprint.

(2)

Within Work Nos. 1B and 2B, the HVDC cable crossings must not, in total, exceed—

(a)

16 in number;

(b)

88,450 cubic metres in volume of cable crossing material;

(c)

98,100 square metres in seabed footprint.

Annotations

Commencement

I1

Sch. 1 Pt. 3 para. 12 in force at 26.8.2015, see art. 1