Paragraph 13 Layout rulesI1
England, Wales and Scotland
The positions of wind turbine generators and offshore platforms must be arrayed in accordance with the parameters applicable to Work Nos. 1A and 1B specified in the Requirements and the principles in section 5.2 of Chapter 5 of the environmental statement.
The construction of wind turbine generators or offshore platforms forming part of the Project A offshore works must not commence until the array location and layout plan has been agreed.
The construction of wind turbine generators or offshore platforms forming part of the Project B offshore works must not commence until the array location and layout plan has been agreed.
The construction of the wind turbine generators and offshore platforms must be carried out in accordance with the relevant array location and layout plan.
The array location and layout plans must ensure compliance with sub-paragraph (1).
In this Requirement, “array location and layout plan” means—
in relation to the Project A offshore works, the array location and layout plan referred to in Marine Licence 1 (see Condition 16(a) F1(Pre-construction plans and documentation: Array location and layout plan)).
in relation to the Project B offshore works, the array location and layout plan referred to in Marine Licence 2 (see Condition 16(a) F2(Pre-construction plans and documentation: Array location and layout plan)).
Annotations
Textual amendments
- F1
Words in Sch. 1 Pt. 3 para. 13(6)(a) inserted (1.12.2020) by The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020 (S.I. 2020/1389), arts. 1, 9(a)
- F2
Words in Sch. 1 Pt. 3 para. 13(6)(b) inserted (1.12.2020) by The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020 (S.I. 2020/1389), arts. 1, 9(b)
Commencement
- I1
Sch. 1 Pt. 3 para. 13 in force at 26.8.2015, see art. 1