Article 11 Qualifying actions: overview
A qualifying action is a measure which satisfies Condition A, B or C in this article.
Condition A is that the Administrator is satisfied that the measure—
meets the requirements of article 12 (general requirements);
meets the requirements of article 31 (installation standards, consumer protection and smart meter advice); and
is notified to the Administrator in accordance with article 43.
Condition B (which relates to ECO3 interim delivery actions) is that the Administrator is satisfied that the measure—
is completed on or after 1st April 2022 and before 1st July 2022;
meets the requirements set out in article 13(1)(a), (b), (d), (e) and (g) of the 2018 Order;
meets the requirements of article 31(1)(b) or (c);
is not—
a demonstration action;
the installation of equipment for the generation of heat wholly or partly from biofuel, oil or liquefied petroleum gas, unless the measure is a repair;
the installation of a connection to a district heating system that delivers heat generated wholly or partly from biofuel, oil or liquefied petroleum gas; or
a repair other than—
a repair of a renewable heating system;
a repair of an efficient boiler or an efficient electric storage heater; or
a repair of equipment for the generation of heat wholly or partly from biofuel, oil or liquefied petroleum gas; and
is notified to the Administrator in accordance with article 43.
Condition C is that the measure is a surplus action.