Regulation 8 Application for authorisation for a vehicle
Subject to paragraph (2), an application for an authorisation for a vehicle to be placed on the market must be made to the DFI, or the European Union Agency for Railways, through the one-stop shop and be accompanied by—
evidence of the technical compatibility within the vehicle of the mobile subsystems of which the vehicle is composed, established on the basis of the relevant TSIs and where applicable, notified national rules;
evidence of the safe integration within the vehicle of the mobile subsystems of which the vehicle is composed, established on the basis of the relevant TSIs, notified national rules and the common safety methods;
the technical file compiled in accordance with regulation 21(5);
the EC declaration of verification in evidence of the placing on the market of the mobile subsystems of which the vehicle is composed;
a specification of the area of use of the vehicle and evidence that the technical compatibility of the vehicle with the network within that area of use has been checked and established on the basis of relevant notified national rules, the register of infrastructure referred to in regulation 43 and Commission Implementing Regulation (EU) 402/2013 of 30 April 2013 on the common safety method for risk evaluation and assessment and repealing Regulation (EC) No 352/2009f1 as it has effect in EU law.
Where the area of use of the vehicle includes Ireland or any part of it in addition to Northern Ireland or any part of it, the application must be made to the European Union Agency for Railways, save where the area of use extends into Ireland only to the Irish border stations, in which case the application may be made to the DFI or the European Union Agency for Railways.
Subject to paragraph (4), in considering an application, the DFI must not require checks already carried out under the EC verification assessment procedure to be carried out again.
The DFI may require such additional checks which the DFI considers necessary in relation to the vehicle if that vehicle appears to the DFI not to meet the essential requirements.
Where additional checks are required under paragraph (4) the DFI must—
inform the applicant that the application cannot be determined before the additional checks are carried out, and
notify the European Commission in writing as soon as reasonably practicable of any such additional checks it requires and the reasons for requiring those checks.
Where an application for a vehicle to be placed on the market has been made to the European Union Agency for Railways and the application has been referred to the DFI for assessment in accordance with Article 21 (5) (b) of the 2016 Directive, the DFI must make the assessment referred to in that Article.
Where the European Union Agency for Railways has, in accordance with Article 21 (7) of the 2016 Directive, disagreed with a negative assessment made by the DFI of an application for authorisation, the DFI must cooperate with the European Union Agency for Railways with the intent of achieving a mutually acceptable assessment.
Should a mutually acceptable assessment be unachievable, the assessment of the European Union Agency for Railways of the relevant authorisation must replace the negative assessment made by the DFI unless the DFI has referred the matter for arbitration to the Board of Appeal established under Article 55 of the Agency Regulation.
Whenever tests are necessary in order to obtain documentary evidence of the technical compatibility referred to in paragraph (1)(a) and (e), the DFI may issue a temporary authorisation to the applicant in order for a vehicle to be used on the network for the purposes of practical verification.
The infrastructure manager, in consultation with the applicant, must as far as possible ensure that any tests undertaken under a temporary authorisation granted under paragraph (9) take place within the period of three months beginning with the day after the day on which the applicant’s application is received.
Within the period of one month beginning with the day after the day on which the application is received, the DFI must respond in writing and confirm—
that the file is complete, or
what supplementary information is required for the completion of the file, together with a reasonable deadline for providing it.
Annotations
Footnotes
- f1
-
OJ L 121, 3.5.2013, p. 8.