OpenLegislation

Part 2 Subsystems

Original text. Later amendments are not shown.

  1. 4Requirement for authorisation for the placing in service of fixed installations
  2. 5Requirement for authorisation for placing vehicles on the market
  3. 6Application for authorisation for a fixed installation
  4. 7ERTMS tender approval
  5. 8Application for authorisation for a vehicle
  6. 9Authorisation decision for fixed installations
  7. 10Authorisation decision for vehicles
  8. 11Checks before first use of authorised vehicles
  9. 12Type authorisation
  10. 13Type authorisation: changes to TSIs and notified national rules
  11. 14Non-compliance of vehicles or vehicle types with essential requirements
  12. 15Revocation of vehicle and vehicle type authorisations
  13. 16Authorisation requirements for the renewal or upgrading of fixed installations
  14. 17Authorisation requirements for the renewal or upgrading of vehicles
  15. 18Derogation from need to conform with TSIs
  16. 19Essential requirements for project subsystems
  17. 20Role of project entity
  18. 21Project subsystems: EC verification assessment procedure
  19. 22Requirement for EC declaration of verification for placing on the market of mobile subsystems
  20. 23Project subsystems: EC declaration of verification
  21. 24Retention of technical file
  22. 25Continuing duty on operator in relation to standards
  23. 26Fees payable to the DFI