Part 2 Subsystems
- 4Requirement for authorisation for the placing in service of fixed installations
- 5Requirement for authorisation for placing vehicles on the market
- 6Application for authorisation for a fixed installation
- 7ERTMS tender approval
- 8Application for authorisation for a vehicle
- 9Authorisation decision for fixed installations
- 10Authorisation decision for vehicles
- 11Checks before first use of authorised vehicles
- 12Type authorisation
- 13Type authorisation: changes to TSIs and notified national rules
- 14Non-compliance of vehicles or vehicle types with essential requirements
- 15Revocation of vehicle and vehicle type authorisations
- 16Authorisation requirements for the renewal or upgrading of fixed installations
- 17Authorisation requirements for the renewal or upgrading of vehicles
- 18Derogation from need to conform with TSIs
- 19Essential requirements for project subsystems
- 20Role of project entity
- 21Project subsystems: EC verification assessment procedure
- 22Requirement for EC declaration of verification for placing on the market of mobile subsystems
- 23Project subsystems: EC declaration of verification
- 24Retention of technical file
- 25Continuing duty on operator in relation to standards
- 26Fees payable to the DFI