Regulation 20 Role of project entity

Original text. Later amendments are not shown.

(1)

In order for an application for an authorisation to place a vehicle on the market or to place a fixed installation into service to be valid, a project entity must—

(a)

engage an EU notified body or an NI notified body to carry out the EC verification assessment procedure, other than in relation to notified national rules, in accordance with regulation 21;

(b)

ensure that an EU notified body or an NI notified body, whether that originally engaged or another, continues to be engaged until authorisation under these Regulations is given or refused;

(c)

where there are applicable notified national rules, engage an NI designated body to carry out an EC verification assessment procedure in accordance with regulation 21.

(2)

The engagement of an EU notified body or an NI notified body under paragraph (1)(a) must begin at the design stage and cover the entire manufacturing period through to the acceptance stage before the project subsystem is placed on the market or in service.

(3)

A project entity must not draw up an EC declaration of verification in relation to a project subsystem unless—

(a)

the project entity is satisfied that the essential requirements are met, including interfaces with the rail system;

(b)

the EC verification assessment procedure has been carried out by an EU notified body or an NI notified body in accordance with regulation 21;

(c)

an EC certificate of verification has been drawn up by an EU notified body or an NI notified body;

(d)

the EC verification assessment procedure has been carried out by an NI designated body where there are applicable notified national rules permitting this;

(e)

an EC certificate of verification has been drawn up by an NI designated body where there are applicable notified national rules permitting this;

(f)

a technical file has been prepared containing the information and documents specified in regulation 21(5) and, if applicable, regulation 21(7).

(4)

Where a project entity is making an application for authorisation of a vehicle type in accordance with regulation 12(2) or there has been a change to an applicable TSI or notified national rule in accordance with regulation 13, this regulation and regulation 21 only apply to the extent necessary to satisfy the DFI that an authorisation must be granted under these Regulations.