OpenLegislation

Part 2 UNIT X PARAMETERSI1

England and Wales

Table 13

ComponentWork No.Maximum length (m)Maximum width (m)Maximum height (m AGL)Maximum height (m AOD)
Turbine hall building1A(ii)87232834
Heat recovery steam generator building (up to two)1A(iv)55294955
Exhaust gas emission flue stacks (up to two)1A(iv)––123129
Bypass stack (up to two) (excluding supporting structures)1A(v)––123129
Transformers1A(vi)36201117
Gas turbine air inlet filter house1A(vii)26273541
Power control centre1A(viii)1717612
Turbine outage store building (up to two)1A(xiv)113432834
Fuel gas station (up to two)1A(xvi)2619713
Main pipe rack1B(i)600122531
Battery storage facility including any structure (where constructed in its entirety in a single stage being stage 1)3A180601016
Battery storage facility including any structure (where constructed in two stages being stage 1 and stage 2)3A90601016
Gas insulated switchgear banking building4A18121117
Control room building for gas insulated switchgear4A26121117
Gas receiving facility (GRF) Compound585851016
Pig Trap Facility (Launching) Compound6B3030510
Minimum Offtake Connection6A3030510
Reinstatement of sludge lagoon12A8255––

Table 14

ComponentWork No.Minimum height (m AGL)Minimum height (m AOD)
Exhaust gas emission flue stacks (up to two)1A(iv)122.5128.5
Bypass Stack (up to two) (excluding supporting structures)1A(v)122.5128.5

Annotations

Commencement

I1

Sch. 13 Pt. 2 in force at 25.10.2019, see art. 1