Part 2 UNIT X PARAMETERSI1
England and Wales
Table 13
| Component | Work No. | Maximum length (m) | Maximum width (m) | Maximum height (m AGL) | Maximum height (m AOD) |
|---|---|---|---|---|---|
| Turbine hall building | 1A(ii) | 87 | 23 | 28 | 34 |
| Heat recovery steam generator building (up to two) | 1A(iv) | 55 | 29 | 49 | 55 |
| Exhaust gas emission flue stacks (up to two) | 1A(iv) | – | – | 123 | 129 |
| Bypass stack (up to two) (excluding supporting structures) | 1A(v) | – | – | 123 | 129 |
| Transformers | 1A(vi) | 36 | 20 | 11 | 17 |
| Gas turbine air inlet filter house | 1A(vii) | 26 | 27 | 35 | 41 |
| Power control centre | 1A(viii) | 17 | 17 | 6 | 12 |
| Turbine outage store building (up to two) | 1A(xiv) | 113 | 43 | 28 | 34 |
| Fuel gas station (up to two) | 1A(xvi) | 26 | 19 | 7 | 13 |
| Main pipe rack | 1B(i) | 600 | 12 | 25 | 31 |
| Battery storage facility including any structure (where constructed in its entirety in a single stage being stage 1) | 3A | 180 | 60 | 10 | 16 |
| Battery storage facility including any structure (where constructed in two stages being stage 1 and stage 2) | 3A | 90 | 60 | 10 | 16 |
| Gas insulated switchgear banking building | 4A | 18 | 12 | 11 | 17 |
| Control room building for gas insulated switchgear | 4A | 26 | 12 | 11 | 17 |
| Gas receiving facility (GRF) Compound | 5 | 85 | 85 | 10 | 16 |
| Pig Trap Facility (Launching) Compound | 6B | 30 | 30 | 5 | 10 |
| Minimum Offtake Connection | 6A | 30 | 30 | 5 | 10 |
| Reinstatement of sludge lagoon | 12A | 82 | 55 | – | – |
Table 14
| Component | Work No. | Minimum height (m AGL) | Minimum height (m AOD) |
|---|---|---|---|
| Exhaust gas emission flue stacks (up to two) | 1A(iv) | 122.5 | 128.5 |
| Bypass Stack (up to two) (excluding supporting structures) | 1A(v) | 122.5 | 128.5 |
Annotations
Commencement
- I1
Sch. 13 Pt. 2 in force at 25.10.2019, see art. 1