Part 3 UNIT Y PARAMETERSI1
England and Wales
Table 15
| Component | Work No. | Maximum length (m) | Maximum width (m) | Maximum height (m AGL) | Maximum height (m AOD) |
|---|---|---|---|---|---|
| Turbine hall building | 2A(ii) | 92 | 23 | 28 | 34 |
| Heat recovery steam generator building (up to two) | 2A(iv) | 55 | 29 | 49 | 55 |
| Exhaust gas emission flue stacks (up to two) | 2A(iv) | – | – | 123 | 129 |
| Bypass stack (up to two) | 2A(v) | – | – | 123 | 129 |
| Transformers | 2A(vi) | 36 | 20 | 11 | 17 |
| Gas turbine air inlet filter house | 2A(vii) | 26 | 27 | 35 | 41 |
| Power control centre | 2A(viii) | 17 | 17 | 6 | 12 |
| Fuel gas station (up to two) | 2A(xv) | 26 | 19 | 7 | 13 |
| Main pipe rack | 2B(i) | 1100 | 12 | 25 | 31 |
| Battery storage facility including any structure (where constructed in two stages being stage 1 and stage 2) | 3B | 90 | 60 | 10 | 16 |
| Gas insulated switchgear banking building or extension to 4A building | 4B | 18 | 12 | 11 | 17 |
| Sludge lagoon (up to two) | 12B | 82 | 55 | – | – |
| Cable Sealing End Compound | 8B(ii) | 35 | 28 | 20 | 26 |
Table 16
| Component | Work No. | Minimum height (m AGL) | Minimum height (m AOD) |
|---|---|---|---|
| Exhaust gas emission flue stack (up to two) | 2A(iv) | 122.5 | 128.5 |
| Bypass stack (up to two) | 2A(v) | 122.5 | 128.5 |
Annotations
Commencement
- I1
Sch. 13 Pt. 3 in force at 25.10.2019, see art. 1