OpenLegislation

Schedule 14 DOCUMENTS AND PLANS TO BE CERTIFIEDI1

England and Wales

Table 17

(1)Document name(2)Document reference(3)Revision number(4)Date
the access and rights of way plansKey plan: 2.40121.05.2018
Sheet 2: 2.40207.11.2018
Sheet 3: 2.40121.05.2018
Sheet 4: 2.40121.05.2018
Sheet 5: 2.40206.12.2018
Sheet 6: 2.40121.05.2018
Sheet 7: 2.40121.05.2018
Sheet 8: 2.40121.05.2018
Sheet 9: 2.40121.05.2018
Sheet 10: 2.40121.05.2018
Sheet 11: 2.40121.05.2018
Sheet 12: 2.40121.05.2018
Sheet 13: 2.40121.05.2018
Sheet 14: 2.40121.05.2018
Sheet 15: 2.40121.05.2018
Sheet 16: 2.40121.05.2018
Sheet 17: 2.40121.05.2018
Sheet 18: 2.40121.05.2018
Sheet 19: 2.40121.05.2018
Sheet 20: 2.40121.05.2018
Sheet 21: 2.40121.05.2018
Sheet 22: 2.40121.05.2018
Sheet 23: 2.40121.05.2018
the application guide1.2 F1014 03.04.2019
the book of reference4.3A00721.03.2019
the CHP statement5.600222.11.2018
the environmental statementenvironmental statement volume 1: 6.1 (excluding chapter 3)001 (excluding chapter 3)29.05.2018 (excluding chapter 3)
environmental statement volume 1: 6.1 (chapter 3)00230.01.2019
environmental statement volume 2: 6.2
appendices 1.1, 1.2, 3.1, 5.3, 5.4, 5.5, 5.6, 5.7, 5.8, 6.1, 6.2, 6.3, 7.1, 7.2, 7.3, 8.1, 8.2, 8.3, 9.1, 9.2, 9.3, 9.4, 9.5, 9.6, 9.7, 9.8, 9.9, 10.1, 10.2, 10.3, 10.4, 10.5, 11.1, 15.1, 16.1, 16.2, 16.3, 16.4, 17.1, 17.2, 17.300129.05.2018 F2(submission date)
appendix 9.10003 28.03.2019
appendices 5.1 and 5.200313.12.2018
environmental statement volume 3: 6.3 001 22.05.2018
breeding bird survey: 8.4.2001 September 2018
reptile survey: 8.4.3001 20.09.2018
bat activity survey: 8.4.4001 October 2018
cover letter in relation to removal of stage 0, the site reconfiguration works, from the applicationN/A08.11.2018
removal of stage 0 mitigation review: 8.5.5001 07.11.2018
assessment of non-material amendments to proposed scheme: 8.4.8001 14.11.2018
errata – environmental statement (chapters 7, 8 and 11): 8.3.1001 03.10.2018
update to the cumulative assessment: 8.4.9001 15.11.2018
the flood risk assessment6.800308.11.2018
the land plansKey plan: 2.203 06.11.2018
Sheet 2: 2.20404.01.2019
Sheet 3: 2.20306.11.2018
Sheet 4: 2.20306.11.2018
Sheet 5: 2.20404.01.2019
Sheet 6: 2.20306.11.2018
Sheet 7: 2.20207.11.2018
Sheet 8: 2.20306.11.2018
Sheet 9: 2.20207.11.2018
the outline construction environmental management plan6.5005 18.03.2018
the outline construction traffic management plan6.2.5.200313.12.2018
the outline construction worker travel plan6.2.5.100313.12.2018
the outline public right of way management plan8.4.6 003 20.02.2019
the outline landscape and biodiversity strategy6.700528.03.2019
the works plansKey plan: 2.3A0413.12.2018
Sheet 2: 2.3A0222.10.2018
Sheet 3: 2.3A0116.05.2018
Sheet 4: 2.3A0116.05.2018
Sheet 5: 2.3A0222.10.2018
Sheet 6: 2.3A0222.10.2018
Sheet 7: 2.3A0222.10.2018
Sheet 8: 2.3A0116.05.2018
Sheet 9: 2.3A0116.05.2018
Sheet 10: 2.3A0222.10.2018
Sheet 11: 2.3A0222.10.2018
Sheet 12: 2.3A0116.05.2018
Sheet 13: 2.3A0116.05.2018
Sheet 14: 2.3A0116.05.2018
Sheet 15: 2.3A0116.05.2018
Sheet 16: 2.3A0116.05.2018
Sheet 17: 2.3A0116.05.2018
Sheet 18: 2.3A0116.05.2018
Sheet 19: 2.3A0222.10.2018
Sheet 20: 2.3A0116.05.2018
Sheet 21: 2.3A0222.10.2018
Sheet 22: 2.3A0116.05.2018
Sheet 23: 2.3A0116.05.2018
Sheet 24: 2.3A0322.10.2018
Sheet 25: 2.3A0222.10.2018
Sheet 26: 2.3A0229.06.2018
Sheet 27: 2.3A0116.05.2018
Sheet 28: 2.3A0116.05.2018
Sheet 29: 2.3A0116.05.2018
Sheet 30: 2.3A0222.10.2018
Sheet 31: 2.3A0222.10.2018
Sheet 32: 2.3A0222.10.2018
Sheet 33: 2.3A0116.05.2018
Sheet 34: 2.3A0116.05.2018
Sheet 35: 2.3A0109.05.2018
Sheet 36: 2.3A0116.05.2018
Sheet 37: 2.3A0222.10.2018
Sheet 38: 2.3A0116.05.2018
Sheet 39: 2.3A0116.05.2018
Sheet 40: 2.3A0116.05.2018
Sheet 41: 2.3A0116.05.2018
Sheet 42: 2.3A0116.05.2018

Annotations

Textual amendments

F1

Words in Sch. 14 Table 17 substituted (19.8.2020) by The Drax Power (Generating Stations) (Correction) Order 2020 (S.I. 2020/879), art. 1(2), Sch.

F2

Words in Sch. 14 Table 17 inserted (19.8.2020) by The Drax Power (Generating Stations) (Correction) Order 2020 (S.I. 2020/879), art. 1(2), Sch.

Commencement

I1

Sch. 14 in force at 25.10.2019, see art. 1