Paragraph 1 InterpretationI1
England and Wales
In this Schedule—
“construction laydown area” means the land on which numbered work 9 is authorised to be carried out as shown on the works plans;
“pipeline area” means the land on which numbered works 5, 6 and 7 are authorised to be carried out as shown on the works plans;
“power station area” means the land on which numbered works 1, 2, 3, 4, 8, 12 and 13 are authorised to be carried out as shown on the works plans;
“shut down period” means a period after physical construction works have finished for the day during which activities including changing out of work gear, the departure of workers, post-works briefings and closing and securing the site take place; and
“start up period” means a period prior to physical construction works starting for the day during which activities including the opening up of the site, the arrival of workers, changing into work wear and pre-work briefings take place.