Part 2 Conditions
England, Wales and Scotland
- 1Design parameters
- 2Design parameters
- 3Design parameters
- 4Design parameters
- 5Design parameters
- 6Design parameters
- 7Design parameters
- 8Design parameters
- 9Design parameters
- 10Notifications and inspections
- 11Aids to navigation
- 12Aids to navigation
- 13Aviation safety
- 14Chemicals, drilling and debris
- 15Force majeure
- 16UXO clearance
- 17Pre-construction plans and documentation
- 18Pre-construction plans and documentation
- 19Reporting of engaged agents, contractors and vessels
- 20Pre-construction monitoring and surveys
- 21Construction monitoring
- 22Post construction
- 23Reporting of impact pile driving/detonation of explosives
- 24Scour protection and cable protection during operation
- 25Co-operation
- 26Southern North Sea Special Area of Conservation Site Integrity Plan (Piling)
- 27Southern North Sea Special Area of Conservation Site Integrity Plan (UXO clearance)
- 28Control of piling and UXO detonations
- 29Herring spawning
- 30Sediment sampling
- 31Completion of construction